Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | ₹9.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.3 L+₹3.2 L (35.1%)Rejected-Finance | ₹12.3 L+₹3.2 L (35.1%) | L2 | Rejected-Finance L2 |
| 3 | L2₹12.3 L+₹3.2 L (35.1%)Rejected-Finance | ₹12.3 L+₹3.2 L (35.1%) | L2 | Rejected-Finance L2 |
| 4 | L2₹12.3 L+₹3.2 L (35.1%)Rejected-Finance | ₹12.3 L+₹3.2 L (35.1%) | L2 | Rejected-Finance L2 |
| 5 | L2₹12.3 L+₹3.2 L (35.1%)Rejected-Finance AT KAGURIGORADA PO HANTUK PURI | ₹12.3 L+₹3.2 L (35.1%) | L2 | Rejected-Finance L2 |
Tender Value
₹12.3 L
EMD Value
₹12,300
Closing Date
5 Jun 2026, 1:00 pmClosed
Superintending Engineer
O/o the SE, Kendrapara Irr. Division, Kendrapara
Jungle Clearance and rain cut filling
2026_KIRRD_129770_53
e-Procurement Notice No.KID-02 of 2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Kendrapara
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹12,300
Yes
25 Jul 2026
26 May 2026
6 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
26 May 2026 - 1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50M outsides the periphery of the area etc.complete asper direction of Engineer in Charge. | 1,37,170 | One Cum. | 2.9 | ₹3,97,793 |
| 2 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5 Km on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering and ordinary compaction by PRR for all heights including construction, maintenance, watering and lighting of haul road and borrow area and royality of earth etc.complete asper the direction of Engineer in Charge. Borrow area will be arranged by the Agency at his own cost and risk.(Measurement to be taken on finished compacted section & borrow area will be arranged by the Agency at his own cost and risk.) | 2,933 | One Cum. | 283.9 | ₹8,32,678.7 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
TechBidKID_106.pdf
Tender Documents • 1.11 MB
BOQ_592677.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .