| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹39.2 L+₹4.5 L (12.9%)Rejected-Finance FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹40.8 L+₹6.1 L (17.5%)Rejected-Finance ROOM NO D 290 PART III GALI NO 8 SHREE GANESH MURTHI NAGAR CUFFE PARADE ROAD COLABA MUMBAI 400005 | MUMBAI | MAHARASHTRA | 400005 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹42.0 L+₹7.3 L (20.9%)Rejected-Finance | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹42.3 L+₹7.6 L (21.8%)Rejected-Finance FLAT NO A 102 ASHOKVAN RAJSHIV CO OP HSG SOC SHIV VALLABH ROAD DAHISAR EAST MUMBAI 400 068 | MUMBAI SUBURBAN | MAHARASHTRA | 400068 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
4 Jul 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIRS TO COMMON AREA WINDOW VENTILATORS FLOORING STAIRCASE RAILINGTERRACE DOORS PLINTH PROTECTION SHAFT AREA PIPELINE AND CONNECTED WORKS AT RS COLABA UNDER AGE BR II (NW) NAVY NAGAR COLABA MUMBAI
2022_MES_528951_1
8281/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.4 L
Yes
15 Jul 2022
6 Jun 2022
6 Jul 2022
6 Jun 2022
4 Jul 2022
27 Jun 2022
6 Jun 2022 - 25 Jun 2022
Amount
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles and rubbish off the premises etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 15mm thick in CM 1:6 for laying floor finishes complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and incliding 15mm thick CM (1:4) as in backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour non-skid coloured Ceramic tiles 7mm thick (square/rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in cement mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour Coloured glazed ceramic tiles 450 x300 x7 mm thick on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and directed by Engineer-in-Charge
Material and labour for rendering 10mm thick in cement mortar 1:4 on backing coat of wall tiles etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking up or down GI tubing and connections 15 mm bore including cleaning for refixing or removal to store complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Refixing old GI tubing and connection15 mm bore in new or old position in ( Walls, ceiling, floors etc) with old accesories complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing GI Tubing 15 mm bore medium grade with all fitting and fixed complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down cement plaster of any discription including racking out joints hacking for key scrubbing down with water in patches n.exc. 4 Sqm each complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for rendering 15mm thick in CM 1:6 on other than fair faces of bricks work or concrete finished even and smooth without using extra cement complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for 05 mm thick plastering in CM 1:3 on concrete surface on ceiling finished even and smooth complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net etc all complete all as specified and directed by Engineer-in-Charge.(Note :- WPC shall be measured and paid separately)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved ISI make complete all as specified and directed by Engineer-in-Charge
Material and labour preparing newly plastered surfaces of walls and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer & bio wash on wall complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour preparing surfaces, plastered or unplastered new surfaces, priming plastered and other surfaces with alkali-resistant priming paint and applying two coats of distemper oil emulsion over a coat of wall care putty, white or tinted on walls all complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Complete removal of existing treatment from wall surfaces by scrapping, washing & applying two coat of Oil bound distemper of approved make on wall over a coat of wall priming paint over a coat of Birla white putty on plastered surface and filling the surface inperfections such as holes, dirt, fine cracks all complete including preparation of surfaces complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of surface plastered or unplastered old surfaces and applying two coats of white wash on ceiling complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
All as per item 34.00 above but on ceiling.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint over a coat of antirush paint/red oxide primer, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Dismantling of stone slabs, bedded and pointed in any mortar of any description or thickness in floors, aprons etc complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour granite (of any type) slab 18 to 20mmthick machine cut,bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding and polishing complete for kitchen plateform etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour machine cut Kota stone (greenish colour, mirror polished) slab flooring 18 to 20 mm thick over cement screed bed laid and jointed with grey cement slurry mixed with pigment to match the shade of slab incl rubbing and mirror polishing, over & incl 20mm thick screed bed in CM 1:6 complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour preparation of old decorated surfaces of wall including washing and applying two coat of Acrylic emulsion paint exterior grade (100% Acrylic) over one coat of primer incl necessary scaffolding, Safety net etc all complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for water proofing treatment of external walls by applying two coats of elastomeric external acrylic water proofing coating material (STP Shalicryl 215)after cleaning the surface thoroughly and sealing all cracks with acrylic sealing compound as per the manufacturer’s specifications and directions of Consultant/Architect. Make : Build core STP chemicals or equivalen complete all as specified and directed by Engineer-in-Charge. (Note :- work will be carred out with scafolding all over bldg upto 14th floor of wall. Rate of scaffolding & acrylic based exterion paint is included in this item).
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour anodised aluminium sheeting 22 gauge thick fixed in repairs as in crumple section complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Dismantling of MS grill of any description and position etc complete all as specified and directed by Engr-in-Charge.
Material and labour for fabrication of framed work as MS grills. with ends of bars shouldered and or riveted or forged into spikes, framed guard bars barred iron doors, ladders framed balusters, walk ways, railings, framework of water tanks and similar work conform to Fe 290 Gde-E-165 & fixed in position as directed etc complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of new surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint over a coat of antirush paint/red oxide primer, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down chowkats with shutter (without taking shutter from the frame) not exc 1.5 sqm each complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing powdercoated aluminium frame/track or shutters for windows, ventilators etc. with one or more rebates including joining cleat for fixing etc.fixed or sliding type/louvered window or ventilator without sash bar, aluminium including necessary joining cleats, glazing clips, rubber packing, anodised alumnium snap beading, screws and locking arrangement etc complete all as specified and directed by Engiener-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing aluminium alloy wire mesh 0.45 mm nominal dia of wire and average width of aperture 1.4 mm fixed with aluminium wire staples alu shutters complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 4 mm thick figured glass pin headed type and glazing with aluminium and neoprene beads in square not exc 0.5 sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 4mm thick plain sheet glass ordinary quality and glazing with aluminium and neoprene beads in square n. exc 0.5 sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour aluminium anodised grill with suitable aluminium anodised frame section manufactured by M/S Deco grill pattern DG-104 (10mm dia and aparture 75mm) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down CI soil/waste/vent/rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing CI soil/waste/vent pipe in any length with ears 100mm bore (sand cast) in any length with cement joints fixed to walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing CI soil/waste/vent pipe in any length with ears 75mm bore (sand cast) in any length with cement joints fixed to walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing CI bends (any radius) for soil/waste pipes 100mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing CI bends (any radius) for soil/waste pipes 75mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing CI branch piececs single (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 100mm bore pipe (Y or T) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing CI branch piececs single (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 75mm bore pipe (Y or T) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 100mm cast iron sanitary connection socket of suitable length to fit WC out-let complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down PVC rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing PVC (SWR) pipes 160mm bore single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing PVC (SWR) bends 160mm bore any radius complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Removal of debries outside of MD land exc. 5 Km but n.exc. 10km complete all as specified and directed by Engr-in-Charge.
RAMESH ENTERPRISES
DHARICHHAN ENTERPRISE
Shetty Construction Co
BOB ENTERPRISES
SHREE JAGDISH FURNITURE CO.
Nilesh Construction
Vandan Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .