Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.2 LAdmitted-Finance | ₹57.2 L | L1 | Admitted-Finance |
| 2 | L2₹57.4 LAdmitted-Finance | ₹57.4 L | L2 | Admitted-Finance |
| 3 | L3₹58.3 LAdmitted-Finance | ₹58.3 L | L3 | Admitted-Finance |
| 4 | L4₹61.5 LAdmitted-Finance | ₹61.5 L | L4 | Admitted-Finance |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BABEL BROTHERS L3 | K.C. Engineering Co. L1 | YASH ELECTRICALS L2 | M/S MANNU ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Safety & Security,operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system.if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs. 100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 5,184 | Job | 100 ₹5,18,400 Lowest | 100 ₹5,18,400 Lowest | 100 ₹5,18,400 Lowest | 100 ₹5,18,400 Lowest |
| 2.00 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | 1 | Job | 30,000 ₹30,000 | 25,000 ₹25,000 Lowest | 50,000 ₹50,000 | 56,000 ₹56,000 |
Tender Value
₹94.5 L
EMD Value
₹1.9 L
Closing Date
9 Jul 2026, 6:00 pmClosed
Sr DGM Bhilwara
RIICO Bhilwara
Providing and Fixing of Street Light at Industrial Area Kapasan
2026_RIICO_571935_2
2026-27/17
Open Tender
Electrical Works
Percentage
270 days
RIICO Bhilwara
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
RIICO
₹1.9 L
17 Aug 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Safety & Security,operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system.if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs. 100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 5,184 | Job | - | - |
| 2 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | 1 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
SLKPNTD.pdf
Tender Documents • 0.19 MB
POWERSPECIALCONDATION.pdf
Other Document • 0.40 MB
BOQ_1017740.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].