| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹10.5 L (6.38%)Admitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | ₹1.8 Cr+₹10.5 L (6.38%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹38.4 L (23.3%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.0 Cr+₹38.4 L (23.3%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹50.6 L (30.7%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹2.2 Cr+₹50.6 L (30.7%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | - | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | JD ENTERPRISES L4 | K DHINAKARAN L3 | K S CONSTRUCTION L1 | D RAVI L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in hard gravelly soil with initial lead and lift of etc., complete. | 1,811.5 | m3 | 150 ₹2,71,725 | 250 ₹4,52,875 | 110 ₹1,99,265 | 96 ₹1,73,904 Lowest |
| 2.00 | Providing Shorring and Shuttering using 40mm thick country work planks and 100 x 50 mm Scantlings Etc., including cost of all materials, Labour, lead, lift, etc., complete | 675 | M2 | 100 ₹67,500 | 100 ₹67,500 | 25 ₹16,875 Lowest | 195 ₹1,31,625 |
| 3.00 | Supplying and filling M- sand for foundation and basement including watering and consolidation including cost of M-sand all labour lead lift etc. complete | 42.5 | M3 | 1,000 ₹42,500 | 1,700 ₹72,250 | 1,000 ₹42,500 | 200 ₹8,500 Lowest |
| 4.00 | Plain cementconcrete 1:3:6 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 51.5 | M3 | 6,000 ₹3,09,000 | 8,000 ₹4,12,000 | 4,500 ₹2,31,750 Lowest | 4,900 ₹2,52,350 |
| 5.00 | RCC 1:1.5:3 using 12-20mm HBG machine crushed metal without form work, including cost of all materials, curing, all labour charges, lead, lift, etc. complete for raft and other concretes (excluding cost of steel reinforcement.) | 211.5 | M3 | 10,000 ₹21,15,000 | 8,000 ₹16,92,000 | 5,000 ₹10,57,500 Lowest | 5,900 ₹12,47,850 |
| 6.00 | RCC 1:1.5:3, with 12 to 20mm HBG m/c metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete ( excluding cost of steel reinforcement.) | 151.5 | M3 | 13,000 ₹19,69,500 | 10,000 ₹15,15,000 | 8,000 ₹12,12,000 Lowest | 9,600 ₹14,54,400 |
| 7.00 | PCC 1:2:4 using 12 to 20mm HBG machine crushed metal without form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. | 528 | M3 | 6,000 ₹31,68,000 | 7,000 ₹36,96,000 | 4,000 ₹21,12,000 Lowest | 5,600 ₹29,56,800 |
| 8.00 | PCC 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 30 | M3 | 12,000 ₹3,60,000 | 8,000 ₹2,40,000 | 7,000 ₹2,10,000 Lowest | 8,900 ₹2,67,000 |
| 9.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift, labour etc., complete. | 25.5 | MT | 60,000 ₹15,30,000 | 50,000 ₹12,75,000 | 55,000 ₹14,02,500 | 49,600 ₹12,64,800 Lowest |
| 10.00 | Providing Brick work in Cement mortar 1:5 using second class, chamber burned bricks of size 9" x 4 3/8" x 2 3/4" including cost of all materials, labour lead lift all T & P's, Scoffolding, pointing, curing etc complete and as directed by the Engineer at site. | 38 | m3 | 6,000 ₹2,28,000 Lowest | 8,000 ₹3,04,000 | 6,000 ₹2,28,000 Lowest | 6,900 ₹2,62,200 |
Tender Value
₹2.1 Cr
EMD Value
₹1.7 L
Closing Date
29 Dec 2023, 2:30 pmClosed
CE/TP-I/CNI
The Chief Engineer Transmission Projects I / Chennai 3rd Floor 110 KV GIS Substation building A10 Guindy Industrial Estate, Guindy Chennai 32
Providing 230KV breaker plinth foundation for AH towers and erection of 230 KV strung bus structures and allied civil works for providing additional 1no 100 MVA transformer at Siruseri 230 110 KV SS
2023_EB_401007_1
TP1-73/2023-24
Open Tender
Civil Works - Others
Works
120 days
Siruseri
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
Yes
6 Feb 2024
18 Dec 2023
30 Dec 2023
18 Dec 2023
29 Dec 2023
18 Dec 2023
Amount
Earth work excavation for foundation in hard gravelly soil with initial lead and lift of etc., complete.
Providing Shorring and Shuttering using 40mm thick country work planks and 100 x 50 mm Scantlings Etc., including cost of all materials, Labour, lead, lift, etc., complete
Supplying and filling M- sand for foundation and basement including watering and consolidation including cost of M-sand all labour lead lift etc. complete
Plain cementconcrete 1:3:6 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm HBG machine crushed metal without form work, including cost of all materials, curing, all labour charges, lead, lift, etc. complete for raft and other concretes (excluding cost of steel reinforcement.)
RCC 1:1.5:3, with 12 to 20mm HBG m/c metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete ( excluding cost of steel reinforcement.)
PCC 1:2:4 using 12 to 20mm HBG machine crushed metal without form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.
PCC 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift, labour etc., complete.
Providing Brick work in Cement mortar 1:5 using second class, chamber burned bricks of size 9" x 4 3/8" x 2 3/4" including cost of all materials, labour lead lift all T & P's, Scoffolding, pointing, curing etc complete and as directed by the Engineer at site.
Refilling with fine sand in layers well consolidated as per standard specification including cost of filling lead, lift, labour for filling, well ramming, consolidation etc., complete
Refilling with Excavated earth in layers well consolidated as per standard specification including cost of filling lead, lift, labour for filling, well ramming consolidation etc., complete
Assembling of stub and cleat using template for 'H' type towers including cost of template and transport of template,stubs& cleats to site, all labour lead, lift, etc, complete.
Providing pipe type earthing using 25 mm dia G I pipe 3m length including cost of pipe, labour, fabrication of earth strip lead, lift etc. complete.
Supplying, transport of "H" type towers, booms and all other lattice structure including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Labour charges for erection of "H" type towers, booms and all other 230/110 KV lattice structures including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Supplying and transport of various size of ISI GI Bolt&Nut and washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc complete.
Plastering with CM 1:5-12mm thick for wall both interior and exterior faces including cost of all materials lead lift etc complete.
Colour washing two coats using white cement mixed with approved asian exterior emulsion paint or asian oil paints including cost of all materials, labour, lead, lift, etc. complete.
Fabrication and Labour charges for fixing of GI angles of 50x50x6mm size vertically @ 75cm c/c to the required length for supporting the cable in the cable duct in correct position including labour ,cutting etc., complete as per the drawing and std.specification.
Supplying, transporting fabrication, fixing Labour charges for fixing of MS Rails (90 LBS) for transformer plinth in proper alignment and interconnections the rails with flat on both ends by welding including cost of rail, all materials labour charges, lead, lift etc. complete, as per standard specification
Fabrication and supplying of foundation Bolt and nut of length 1.00 m to 2.00m,threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including cost of template, all material, labour, lead, lift etc., complete
Providing groutpocket holes includig cost of all labour charges, lead and lift etc., complete.
Supplying and spreading of quarry dust for yard area including cost of quarry dust, labour for consolidation, lead, lift, etc. complete.
Supplying and spreading of 20mm HBG metal for yard area including cost of all material, labour for consolidation, lead, lift, etc. complete.
supplying and 160 mm dia PVC pipe 6kg (Make Finolex or Astral aquasafe pipes) including labour for transporting the pipes,cutting and jointing the pipe, laying in position, tying with 7/20 SWG GI wire inside the pipe and closing the ends with end cap including cost of pipe, specials , labour, lead, lift, T&P, etc.,
Supplying and fixing of PVC pipe ISI branded and approved quality as indicated below for water line, sanitory line etc., including cost of PVC special - 25mm dia
Supply and fixing of 1/2" PVC tap of approved brand and quality including cost of all materials labour,lead, lift etc.,complete
Supplying and laying of Pre cast RCC well rings for earth pit having inner dia 0.60 m, thick ness 75mm and 0.30m depth including cost of all materials, labour, curing placing in correct position, lead, lift, etc., complete and as directed by the Engineer at site
Labour charges for Dismantling, removing, clearing of existing AH Tower in 230 KV side as is where is condition for the construction of new substation including cost of all labour, lead, lift, Tools and plants etc. complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
D RAVI
K DHINAKARAN
JD ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_477337.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .