Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.1 LAccepted-Finance | ₹11.1 L | 1 | Accepted-Finance L1 |
| 2 | 2₹11.1 LRejected-Finance 4 19 MANUVAKADU PILLANATHAM PO TIRUCHENGODE TALUK NAMAKKAL DISTRICT 637205 | NAMAKKAL | TAMIL NADU | 637205 | ₹11.1 L | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Royal construction L1 | G K CONSTRUCTION L2 | CRT Traders L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of 30000 Lit's OHT (7.50m Stage) at Mayilpurakadu H/o Pillanatham at Mallasamudram Block in Namakkal District Under SCPAR - 2025 - 2026 | ||||||
| 2.00Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart | ||||||
| 3.00 | First depth of 2m | 47.41 | Cum | 243 ₹11,520.63 | 270 ₹12,800.70 | 243 ₹11,520.63 |
| 4.00 | Second depth of 1m | 9.22 | Cum | 276 ₹2,544.72 | 276 ₹2,544.72 | 276 ₹2,544.72 |
| 5.00 | Sand filling for foundation with M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | 2.3 | Cum | 1,767 ₹4,064.10 | 1,767 ₹4,064.10 | 1,767 ₹4,064.10 |
| 6.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 5.92 | Cum | 5,399 ₹31,962.08 | 5,399 ₹31,962.08 | 5,399 ₹31,962.08 |
| 7.00 | Cement concrete 1:2:4 using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 2.92 | Cum | 6,704 ₹19,575.68 | 6,704 ₹19,575.68 | 6,704 ₹19,575.68 |
| 8.00Reinforced Cement concrete 1: 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slab | ||||||
| 9.00 | Items 1.50 m to 4.50m below GL | 5.25 | Cum | 9,283 ₹48,735.75 | 9,283 ₹48,735.75 | 9,283 ₹48,735.75 |
| 10.00 | Items 0 m to 1.50m below GL | 1.56 | Cum | 9,144 ₹14,264.64 | 9,144 ₹14,264.64 | 9,144 ₹14,264.64 |
Tender Value
₹11.5 L
EMD Value
₹11,500
Closing Date
20 Feb 2026, 3:00 pmClosed
Block Development officer (B.Pt), Mallasamudram
Block Development office, Mallasamudram
Construction of 30000 Lits OHT (7.50m Stage) at Mayilpurakadu H/o Pillanatham at Mallasamudram Block in Namakkal District Under SCPAR - 2025 - 2026
2026_RDTN_658493_1
3808/2025/A2
Open Tender
Civil Works - Others
120 days
Mallasamudram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,500
24 Feb 2026
16 Feb 2026
20 Feb 2026
16 Feb 2026
20 Feb 2026
16 Feb 2026
Construction of 30000 Lit's OHT (7.50m Stage) at Mayilpurakadu H/o Pillanatham at Mallasamudram Block in Namakkal District Under SCPAR - 2025 - 2026
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
First depth of 2m
Second depth of 1m
Sand filling for foundation with M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Cement concrete 1:2:4 using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Reinforced Cement concrete 1: 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slab
Items 1.50 m to 4.50m below GL
Items 0 m to 1.50m below GL
Items Above GL & Upto 4.5m
Items Above 4.5m to 7.32m
Items Above 7.33m to 10.98m
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened all Charges
For Plan surface
Below GL
Curved Surface
Square column
Painting two coats over new plastered using approved cement paint including cost and conveyance of all materials to site and all labour charges etc comoplete
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Supplying , Fabricating,Delivery and placing in position MS steel Ladder wide 0.45m made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded and Jointed etc. , Complete complying with stanard specification.
Supply and delivery of Pipe & Specials following item including all labour charges etc
50mm GI Pipe
50mm GM Gate Valve
50mm dia GI Elbow
50mm dia GI coupling
Provison for Pipe line (Sub Estimate)
Supply and delivery of 63mm PVC Pipe line following pipe including all labour charges etc
Earth work excavation for laying of 63mm pipe line including all charges etc
Laying and Jointing of Following pipe line including all charges etc
Refilling the Trench after laying of 63mm pipe line including all charges etc
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
OHTPill.pdf
Tender Documents • 1.26 MB
BOQ_789990.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid