| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC | ₹2.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 Cr+₹3.3 L (1.27%)Rejected-Finance | ₹2.6 Cr+₹3.3 L (1.27%) | L2 | Rejected-Finance Reject |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
24 Jun 2024, 3:00 pmClosed
Project Director
DRDA, Kallakurichi
Strengthening of MRL03 AKT School to Vaniyandal Pirivu Road Via Siruvangur
2024_RDTN_134315_1
TN3306
Open Tender
Civil Works - Roads
Piece-work
180 days
Kallakurichi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5.2 L
Yes
DRDA, Kallakurichi
28 Feb 2025
17 May 2024
24 Jun 2024
17 May 2024
24 Jun 2024
17 May 2024
24 May 2024
Amount
Strengthening of road from MRL 03 AKT School to Vaniyandal Pirrivu Road via Siruvangur Km 2/970 - 6/450 in Kallakurichi Block in Kallakurichi District
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Excavation for road work in soil with hydralc excavater of 0.9 cum bucket capacity including cutting and loading in tippers, timming bottom and side slope, in accordance with requirement of lines grades and cross section and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specifivation Clause 302.3
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ( Filling with Cut Earth)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ( Carted Earth)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Control Section Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
NEW TECHNALOGY TERRAZYME Laying and spreading a Bio Enzyme based soil stabilised layer by ploughibg existing WBM surface to a thickness of 50 mm and adding 50 mm gravel obtained from borrow pit to get a required thickness of 100 mm as per manufacture design and treating it with TerraZyme in the ratio 1L for 12.5 cum and spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheel vibratory roller to achieve the desired density complete
Control section Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 Low Porasity
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503
Bituminious Maccadam Providing and laying Bituminous Maccadam with hot mix plant using crushed aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades to be followed as per Technical Specification Clause 504
Providing, laying and rolling of Close graded premix surfacing material of 25 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Road marking with Hot Applied Thermoplastic Compound with reflectoriing Glass Beads on Bituminous surface Providing and laying of hot applied thermoplastic compound 2.50mm thick including Glass Beads
Provision for Citizen board
Provision for PMGSY Logo board
Provision for Name board
Provision for PMGSY Maintenance Board
Provision for Kilometer Stones
Provision for Hectameter Stones
Provision for Guard Stone in the all Culvert
60cm equilator triangular Cautionary sign board
60cm Circular mantatory, Octogon sign board
curve board Chevron signs (Curves)
Metal bracket with type IX flotoscent prismatic reflective sheeting which is suitable for guard rail it is available one way/two way. Applied for metal crash barriers/ guard rail/ to provide reflection across wide range observation Reflector(Near culverts & trees)
Provision for Photographic charges
Construction of 1.50 m RCC Slab culvert @ Ch 5/560 in MRL 03 AKT School to Vaniyandal Pirrivu Road via Siruvangur Km 2/970 - 6/450 in Kallakurichi Block
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 20 mm thick compressible fibre board for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel gilling between body wall including cost and conveyance of gravel labour for filling watering and compacting etc complete
Construction of 1.50 m RCC Slab culvert @ Ch 6/214 in MRL 03 AKT School to Vaniyandal Pirrivu Road via Siruvangur Km 2/970 - 6/450 in Kallakurichi Block
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 20 mm thick compressible fibre board for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel gilling between body wall including cost and conveyance of gravel labour for filling watering and compacting etc complete
Construction of 3.00 m RCC Slab culvert @ Ch 5/428 in MRL 03 AKT School to Vaniyandal Pirrivu Road via Siruvangur Km 2/970 - 6/450 in Kallakurichi Block
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Dismantling of existing structure like culverts,bridges, retaining walls and other structure comprising of masonry cement concrete steel work including sorting and dismantling material disposal of unserviceable material
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 20 mm thick compressible fibre board for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel gilling between body wall including cost and conveyance of gravel labour for filling watering and compacting etc complete
Construction of Protective work @ Km 6/075 to 6/125 RHS in MRL 03 AKT School to Vaniyandal Pirrivu Road via Siruvangur Km 2/970 - 6/450 in Kallakurichi Block
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below sill Level)
Cement concrete 1 : 2 :4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above sill Level)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M SUBRAMANI
Bidder Name
M SUBRAMANI
R&D ENGINEERING CONSULTANT AND CONTRACTORS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .