Loading…
Loading…
Tender ID
Tender Value
₹9.6 L
EMD Value
₹95,810
Closing Date
25 Mar 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Construction work of ward office next to sumpwell under zone 06 ward 25
2026_NNKAN_1128546_1
424/AA-6/2025-26
Open Tender
Civil Works
Percentage
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹95,810
21 Mar 2026
21 Mar 2026
25 Mar 2026
21 Mar 2026
25 Mar 2026
21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | |||||
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-lll): 12 graded Brick aggregate 40 mm nominal size). | |||||
| 3Brick work with common burnt clay (non modular) bricks of class-150 in fondation and plinth in superstructure above plinth level Up to floor V level in all shapes and sizes. Cement motar 1:4 (1 cement: 4 coarse sand) | |||||
| 412 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) | |||||
| 5Finishing walls with putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc required for proper completion of work. | |||||
| 6Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work in plinth level 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). | |||||
| 7Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form work for (uoto 5th Floor): Foundations, footings, bases for columns. | |||||
| 9Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one cost of primer [email protected]/10sqm coat curing and cost of all material, labour, T&P etc required for proper completion of work. For two coat. | |||||
| 10Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in positiin and applying a priming coat of approved steel primer all complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.77 MB
BOQ_2104878.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .