Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC 6 31 B THOOKANAMPATTY METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.9 L+₹51,259.20 (15.0%)Rejected-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.1 L+₹72,593.60 (21.2%)Rejected-AOC 19 M G WORKS S BLOCK NEAR PONDY ENGINEERS PONDICHERRY | PONDICHERRY | PUDUCHERRY | 605001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹4.4 L+₹97,232 (28.5%)Rejected-AOC 7TH FLOOR FLAT NO 02 UNITY ENCLAVE BLOCK C MEDAVAKKAM ROAD MAMBAKKAM 600 127 | CHENGALPATTU | TAMIL NADU | 600127 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | JS ENGINEERING WORKS L3 | AGARTHI ENTERPRISES L4 | SRI V M A ENTERPRISES L2 | Sri Lakshmi Enterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Charges for Leading, shifting and lifting of trash rack from work shed and fixing in position by using trolley of Unit No.1 and 3 including transport vehicle, T&P’s and consumables. | 4 | NOS | 14,550 ₹58,200 | 15,500 ₹62,000 | 13,800 ₹55,200 | 12,000 ₹48,000 Lowest |
| 2.00 | Charges for lifting & shifting of trash rack from position and leading, placing to work shed by using Hoist, Trolley of Unit No.1 and 3 including transport vehicle, T&P’s and consumables. | 4 | NOS | 14,550 ₹58,200 | 15,500 ₹62,000 | 13,800 ₹55,200 | 12,000 ₹48,000 Lowest |
| 3.00 | Charges for dismantling of trash rack plates, buffing, cleaning, welding of damaged portion and painting of all area by Epoxy red-oxide, Epoxy black paint as per requirement and re-assembling of all plates & accessories of Unit No.1 and 3 | 4 | NOS | 42,680 ₹1,70,720 | 45,000 ₹1,80,000 | 40,480 ₹1,61,920 | 35,200 ₹1,40,800 Lowest |
| 4.00 | Charges for Cleaning, buffing, welding of damaged portion and painting of Trash rack hoisting Chain as per requirement of Unit No.1 and 3 | 4 | NOS | 16,000 ₹64,000 | 17,000 ₹68,000 | 15,180 ₹60,720 | 13,200 ₹52,800 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,270
Closing Date
9 Jul 2026, 2:00 pmClosed
SE/EGC
SE/EGC/UKT
Dismantling, leading, cleaning, welding, painting and reassembling of trash-rack gate and its hoisting chain of unit 1 and at Mettur Dam Power House in Erode Generation Circle.
2026_EB_682687_1
SE/EGC/GL/04/26 27 dt 16 06 26
Open Tender
Maintenance Works
Works
Dam power house mettur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,270
Yes
24 Sept 2026
24 Jun 2026
10 Jul 2026
24 Jun 2026
9 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Leading, shifting and lifting of trash rack from work shed and fixing in position by using trolley of Unit No.1 and 3 including transport vehicle, T&P’s and consumables. | - | NOS | - | - |
| 2 | Charges for lifting & shifting of trash rack from position and leading, placing to work shed by using Hoist, Trolley of Unit No.1 and 3 including transport vehicle, T&P’s and consumables. | - | NOS | - | - |
| 3 | Charges for dismantling of trash rack plates, buffing, cleaning, welding of damaged portion and painting of all area by Epoxy red-oxide, Epoxy black paint as per requirement and re-assembling of all plates & accessories of Unit No.1 and 3 | - | NOS | - | - |
| 4 | Charges for Cleaning, buffing, welding of damaged portion and painting of Trash rack hoisting Chain as per requirement of Unit No.1 and 3 | - | NOS | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.49 MB
BOQ_820645.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .