| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹69.6 L+₹5.5 L (8.56%)Admitted-Finance 01 DAYAL BAGH OPP BRAHAM KUMARI ASHRAM AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aggarsain Coop L C Society L1 | The Lovepreet Coop Labour Construction Society L2 |
|---|---|---|---|---|---|
| 1.00NS Items | |||||
| 1.01 | Recovery of Old Bricks including loading ,unloading and transportation | 4,736 | NO. | 4 ₹18,944 | 3 ₹14,208 Lowest |
| 1.02 | Providing and fixing of High Quality IP65 NEON FLEX Silicon Profile size 30x20mm fitted with IP20 LED Strip light 10w per meter supplied with IP65 Power supply as per 5mtr roles. complete in all respect as per entire satisfaction of engineer incharge | 17.22 | Metre | 1,760 ₹30,307.2 Lowest | 2,000 ₹34,440 |
| 1.03 | Providing and fixing of GEETA UPDESHSTHALI DHARMSHETRA KURUKSHETRA of height 24` in SS 304 with back acrylic and lighting with power Supply and Warrenty of 2 years with fittings complete with all respect. | 2 | Each | 1,59,714 ₹3,19,428 Lowest | 2,00,000 ₹4,00,000 |
| 1.04 | Providing, fabricating and fixing of MS railing made out of mild steel of height 3` and sections (square/rectangular hollow sections, flats, pipes etc. as per design), including cutting, welding, grinding, and finishing to required shape and pattern complete in all respect as per the direction of engineer in charge. IN RUNNING FEET INSTEAD OF | 22.96 | Per Mtr. | 9,963 ₹2,28,750.48 Lowest | 10,000 ₹2,29,600 |
| 1.05 | Providing and fixing of KRISHNA CHOWK of height 36` in SS 304 with back acrylic and lighting with power Supply and Warrenty of 2 years with fittings complete with all respect. | 2 | Each | 82,098 ₹1,64,196 Lowest | 90,000 ₹1,80,000 |
| 1.06 | Providing and fixing of Stone cladding on 60 to 70mm thick in Pink Sandstone of Bansi pahadpur with carving, grinding, polishing and finishing as per the architecture drawing with fittings complete in all respect as per the direction of engineer charge | 56.08 | Sqm | 22,280 ₹12,49,462.4 Lowest | 25,000 ₹14,02,000 |
| 1.07 | Providing, designing, modelling, fabricating, supplying, transporting, assembling, erecting, installing, finishing and commissioning at site a complete artistic sculpture depicting **Shri Krishna Ji’s Hand with Sudarshan Chakra**, having an approximate sculpture height of **11`-0` to 12`-0`**, over a base/plinth of approximately **7`-0` to 9`-0` height** and approximate base diameter of **12`-0` to 15`-0`**, with an estimated finished weight of about **1.50 tonnes, subject to ±10% variation** due to the artistic and architectural nature of the work. The sculpture shall be developed by an experienced sculptor/artist with correct anatomical proportions, form, posture, detailing and artistic expression as per the approved concept, drawings and 3D model. A detailed clay model shall initially be prepared and properly finished with all required artistic features, contours and details to serve as the master model for casting. The sculpture shall be provided with a suitably designed **Mild Steel internal structural framework/skeleton** for adequate strength, stiffness, dimensional stability and support to the FRP cladding, complete with necessary structural members, bracing, connections and fixing arrangements. The outer artistic surface shall be formed in high-quality **Fibre Reinforced Plastic (FRP) of approximately 3 mm to 5 mm thickness**, suitable for permanent outdoor exposure and resistant to weathering. The FRP components shall be cast using moulds prepared from the approved clay model, carefully removed after proper curing and subsequently assembled and fixed over the MS framework to reproduce the approved artistic form. All joints, connections, casting marks and surface irregularities shall be properly ground, filled, sanded and finished to obtain a smooth and uniform surface ready for application of colour. The complete sculpture, including the Sudarshan Chakra and all associated artistic details, shall be hand-painted and finished by skilled artists using good-quality weather-resistant exterior-grade primer, paints, coatings and protective finishes suitable for prolonged outdoor exposure. The work shall also include loading, unloading, transportation of the sculpture and its components from the fabrication facility to the site, handling, on-site assembly, erection, alignment, anchoring, fixing, minor fabrication wherever required during installation, final finishing, touch-up painting and completion of the sculpture in all respects to the satisfaction of the Engineer-in-Charge. The quoted rate shall include all materials, labour, artistic workmanship, clay modelling, mould preparation, MS internal framework, FRP casting and cladding, painting, transportation, tools, plants, tackles, machinery, erection, installation and all incidental operations necessary for completing the sculpture. **Lighting, illumination, electrical fixtures and associated electrical works shall not be included in this item. Civil works including RCC foundation, pedestal, base/plinth or other supporting civil structures shall also be excluded and shall be provided separately.** The civil foundation/base shall be completed with adequate strength, dimensions, anchoring arrangements and dimensional stability as per the approved structural and architectural design before installation of the sculpture. Necessary water and electricity required during installation shall be made available at site, and the site shall be kept ready well in advance for erection. All dimensions, colours, finishes, proportions, structural details and artistic features shall be finalized as per the approved drawings, model and directions of the Engineer-in-Charge before commencement of final fabrication. **Unit: No.: Quantity: 1 No.** | 1 | Each | 14,55,750 ₹14,55,750 Lowest | 16,00,000 ₹16,00,000 |
Tender Value
₹62.8 L
EMD Value
₹1.5 L
Closing Date
21 Sept 2026, 5:00 pmClosed
Ravi Oberoi
Municipal Council Thanesar
Renovation and beautification of existing corner near Kurukshetra University Gate No. 03
2026_HRY_547196_1
20269E2E9637 C3CA 4933 A2D1 817D1EB17077290ULB
Open Tender
Civil Works
Works
240 days
Kurukshetra (Thanesar)
4 documents required · 4 mandatory
₹5,000
₹1.5 L
Yes
Kurukshetra
5 Oct 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1NS Items | |||||
| 1.01 | Recovery of Old Bricks including loading ,unloading and transportation | 4,736 | NO. | 100 | ₹4,73,600 |
| 1.02 | Providing and fixing of High Quality IP65 NEON FLEX Silicon Profile size 30x20mm fitted with IP20 LED Strip light 10w per meter supplied with IP65 Power supply as per 5mtr roles. complete in all respect as per entire satisfaction of engineer incharge | 17.22 | Metre | 101 | ₹1,739.22 |
| 1.03 | Providing and fixing of GEETA UPDESHSTHALI DHARMSHETRA KURUKSHETRA of height 24` in SS 304 with back acrylic and lighting with power Supply and Warrenty of 2 years with fittings complete with all respect. | 2 | Each | 102 | ₹204 |
| 1.04 | Providing, fabricating and fixing of MS railing made out of mild steel of height 3` and sections (square/rectangular hollow sections, flats, pipes etc. as per design), including cutting, welding, grinding, and finishing to required shape and pattern complete in all respect as per the direction of engineer in charge. IN RUNNING FEET INSTEAD OF | 22.96 | Per Mtr. | 103 | ₹2,364.88 |
| 1.05 | Providing and fixing of KRISHNA CHOWK of height 36` in SS 304 with back acrylic and lighting with power Supply and Warrenty of 2 years with fittings complete with all respect. | 2 | Each | 101 | ₹202 |
| 1.06 | Providing and fixing of Stone cladding on 60 to 70mm thick in Pink Sandstone of Bansi pahadpur with carving, grinding, polishing and finishing as per the architecture drawing with fittings complete in all respect as per the direction of engineer charge | 56.08 | Sqm | 100 | ₹5,608 |
| 1.07 | Providing, designing, modelling, fabricating, supplying, transporting, assembling, erecting, installing, finishing and commissioning at site a complete artistic sculpture depicting **Shri Krishna Ji’s Hand with Sudarshan Chakra**, having an approximate sculpture height of **11`-0` to 12`-0`**, over a base/plinth of approximately **7`-0` to 9`-0` height** and approximate base diameter of **12`-0` to 15`-0`**, with an estimated finished weight of about **1.50 tonnes, subject to ±10% variation** due to the artistic and architectural nature of the work. The sculpture shall be developed by an experienced sculptor/artist with correct anatomical proportions, form, posture, detailing and artistic expression as per the approved concept, drawings and 3D model. A detailed clay model shall initially be prepared and properly finished with all required artistic features, contours and details to serve as the master model for casting. The sculpture shall be provided with a suitably designed **Mild Steel internal structural framework/skeleton** for adequate strength, stiffness, dimensional stability and support to the FRP cladding, complete with necessary structural members, bracing, connections and fixing arrangements. The outer artistic surface shall be formed in high-quality **Fibre Reinforced Plastic (FRP) of approximately 3 mm to 5 mm thickness**, suitable for permanent outdoor exposure and resistant to weathering. The FRP components shall be cast using moulds prepared from the approved clay model, carefully removed after proper curing and subsequently assembled and fixed over the MS framework to reproduce the approved artistic form. All joints, connections, casting marks and surface irregularities shall be properly ground, filled, sanded and finished to obtain a smooth and uniform surface ready for application of colour. The complete sculpture, including the Sudarshan Chakra and all associated artistic details, shall be hand-painted and finished by skilled artists using good-quality weather-resistant exterior-grade primer, paints, coatings and protective finishes suitable for prolonged outdoor exposure. The work shall also include loading, unloading, transportation of the sculpture and its components from the fabrication facility to the site, handling, on-site assembly, erection, alignment, anchoring, fixing, minor fabrication wherever required during installation, final finishing, touch-up painting and completion of the sculpture in all respects to the satisfaction of the Engineer-in-Charge. The quoted rate shall include all materials, labour, artistic workmanship, clay modelling, mould preparation, MS internal framework, FRP casting and cladding, painting, transportation, tools, plants, tackles, machinery, erection, installation and all incidental operations necessary for completing the sculpture. **Lighting, illumination, electrical fixtures and associated electrical works shall not be included in this item. Civil works including RCC foundation, pedestal, base/plinth or other supporting civil structures shall also be excluded and shall be provided separately.** The civil foundation/base shall be completed with adequate strength, dimensions, anchoring arrangements and dimensional stability as per the approved structural and architectural design before installation of the sculpture. Necessary water and electricity required during installation shall be made available at site, and the site shall be kept ready well in advance for erection. All dimensions, colours, finishes, proportions, structural details and artistic features shall be finalized as per the approved drawings, model and directions of the Engineer-in-Charge before commencement of final fabrication. **Unit: No.: Quantity: 1 No.** | 1 | Each | 10 | ₹10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_626843.xls
BOQ • 0.30 MB
3R3BEBZ178558.pdf
Additional Documents • 1.26 MB
OT0178558.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .