Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical VILLAGE P O BAHLI TEHSIL RAMPUR DISTT SHIMLA H P | BAHLI | SHIMLA | HIMACHAL PRADESH | Accepted-Technical Responsive |
Tender Value
₹30.4 L
EMD Value
₹61,000
Closing Date
9 Sept 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH Formation cutting 5.7 mtr. wide road Km. 0.600 to 1.420
2026_PWD_142589_1
PW/RMP/TA/2026-6925 dated 25.08.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,000
Yes
₹61,000
Yes
14 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
3 Sept 2026 - 9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area by mechnical means in all heights and depths, in all kinds of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth lift upto all heights and all leads as directed by the Engineer-in-charge, in conformity with the requirement of technical specification of rural roads clause 1603.1 minium quantity of useful material such as stones, shingles, aggregates and slates etc. i.e. 1573.11 cubic meter, shall be sorted out and stacked along the road side properly, otherwise recovery @300/- per cubic meter shall be effected from the bills of the contractor. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. | 9,506.75 | Per cubic meter | 319.87 | ₹30,40,924.12 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_211848.xls
BOQ • 5.00 MB
SBD.pdf
Tender Documents • 2.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .