Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹23.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹23.9 L+₹12,005.92 (0.51%)Admitted-Fee/PreQual/Technical/Finance | -0.50% | ₹23.9 L+₹12,005.92 (0.51%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST Registration not uploaded |
Tender Value
₹28.3 L
EMD Value
₹56,664
Closing Date
10 Aug 2026, 4:00 pmClosed
office of the ExEn Div Vailoo
office of the ExEn Div Vailoo
Construction of internal road with side drain at MRF centre Kherepora Kokernag
2026_PWDJK_318277_6
ENIT29DivisionVailoo26-27
Open Tender
Civil Works
Percentage
120 days
Vailoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Centralized Designated pooling Account
₹56,664
Yes
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means(Hydraulic excavator) in foundationn treanchs or drain (not exceeding 1.5 m width or 10 sqm on plan) including dressing of site and ramming of bottoms lift upto 1.5 m incl getting out the excavated soil and disposal of surplus excavated soil as directed, within lead of 50 m . Hard Rock (Blasting Prohibited) | 1 | Cum | 0.8 | ₹0.8 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | Sqm | 0.4 | - |
| 3 | Providing and laying dry stone soling(100mm size ) Duly hand packed (quarry) & consolidated with hand Rammers complete job. | - | Cum | 0.2 | - |
| 4 | Providing and laying in position cement concrete of 1:4:8 ratio including curring but excluding cost of centring shuttering and carriage All work upto plinth level using coarse sand and 40 mm nominal size) complete Job. | - | Cum | 0.4 | - |
| 5 | Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 0.4 | ₹0.4 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level .Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | Kg | 0.2 | ₹0.2 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations | - | Sqm | 0.8 | - |
| 9 | P/F OF 100MM pvc HOLES AS PER DIRECTION OF ENGINEER ON CHARGE | - | No | 0.6 | - |
| 10 | Carriage of materials by mechanical transport from source of supply upto site of work Sand and aggregate 30 kms | - | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1047957.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .