| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.7 LAccepted-AOC | ₹15.7 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹17.8 L+₹2.1 L (13.6%)Rejected-AOC VILLAGE BIDDI P O DARWAR TEHSIL DHARMPUR DISTT MANDI H P | ₹17.8 L+₹2.1 L (13.6%) | L-2 | Rejected-AOC Being L-2 |
| 3 | L-3₹19.0 L+₹3.3 L (21.0%)Rejected-AOC | ₹19.0 L+₹3.3 L (21.0%) | L-3 | Rejected-AOC Being L-3 |
| 4 | L-4₹19.4 L+₹3.8 L (24.0%)Rejected-AOC VILLAGE KOTLU P O BAHINA TEHSIL BARSAR DISTRICT HAMIRPUR H P | BAHINA | HAMIRPUR | HIMACHAL PRADESH | ₹19.4 L+₹3.8 L (24.0%) | L-4 | Rejected-AOC Being L-4 |
| 5 | L-5₹19.8 L+₹4.1 L (26.0%)Rejected-AOC R O VILL P O SALOUNI TEHSIL BARSAR DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹19.8 L+₹4.1 L (26.0%) | L-5 | Rejected-AOC Being L-5 |
| Sl No | Description | Qty | Unit | m/sbalagi contector L1 | kuldeep kumar sharma L2 | Ms Rakesh kumar L4 | AVINDER KUMAR L5 | Tilak Singh L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition below G.I.upto 1.50 Metres depth including stacking of serviceable materials and disposal of unserviceable materials within all leads and including cutting necessary reinforcement and separating from R.C.C. work within all leads and lifts & to the entire satisfaction of the Engineer-in-charge . | 22.45 | Per cum | 500 ₹11,225 Lowest | 780 ₹17,511 | 660 ₹14,817 | 680 ₹15,266 | 660 ₹14,817 |
| 2.00Providing and laying cement concrete work 1:1.5:3(1cement 1.5 sand:3 graded stone aggregate 20 mm nominal size ) and curing complete excluding the cost of form work in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | ||||||||
| 2.01 | Foundation footing and bases of columns and the like and mass concrete within all leads and lifts & to the entire satisfaction of the Engineer-in-charge . | 22.73 | Per cum | 8,200 ₹1,86,386 | 7,250 ₹1,64,792.5 | 7,300 ₹1,65,929 | 7,100 ₹1,61,383 Lowest | 7,100 ₹1,61,383 Lowest |
| 2.02 | Walls (any thickness but not less than 0.1 m thickness) attached plasters ,buttnesses ,plinth and string courses etc. from top of foundation level upto floor two level to the entire satisfaction of Engineer-in-Charge. | 22.59 | Per cum | 8,200 ₹1,85,238 | 7,500 ₹1,69,425 | 7,500 ₹1,69,425 | 7,500 ₹1,69,425 | 7,100 ₹1,60,389 Lowest |
| 3.00Providing and laying cement concrete work 1:2:4(1cement:2 sand:4 graded stone aggregate 20 mm nominal size) and cuting complete in all leads & lifts to the entire satisfaction of Engineer-in-Charge. | ||||||||
| 3.01 | Suspended floors, roofs, landings and shelves and their supports, balconies,beams, girders, bressumers and cantilevers upto two floor level complete involving acomplete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 1.39 | Per cum | 8,300 ₹11,537 | 7,000 ₹9,730 | 7,134 ₹9,916.26 | 7,000 ₹9,730 | 6,700 ₹9,313 Lowest |
| 4.00 | Providing tor steel reinforcement for RCC work i/c bending,binding & placing in position complete in all respect with in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 3,269.56 | Per Kg | 85 ₹2,77,912.6 | 82 ₹2,68,103.92 | 92 ₹3,00,799.52 | 85 ₹2,77,912.6 | 81 ₹2,64,834.36 Lowest |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centering, shuttering , strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4.00 meters and removal of the same for insitu-reinforced concrete and plain concrete work in: | ||||||||
| 5.01 | Vertical surfaces such as wall (any thick.) partitions & the like including attached pillasters, buttresses, plinth & string courses & the like with in all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work. | 140.4 | Per sqm | 250 ₹35,100 | 235 ₹32,994 Lowest | 322 ₹45,208.8 | 280 ₹39,312 | 265 ₹37,206 |
| 5.02 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. upto 200mm in thickness as per direction and to the entire satisfaction of the Engineer-in-charge. | 0.61 | Per sqm | 250 ₹152.5 Lowest | 300 ₹183 | 521 ₹317.81 | 530 ₹323.3 | 510 ₹311.1 |
Tender Value
₹22.9 L
EMD Value
₹45,850
Closing Date
13 Apr 2026, 11:00 amClosed
Executive Engineer
EE JSV Division Barsar
Jacketing of filter Bed Unit No.1 LWSS Bhota Ropari Ujhan at Didwin Tikker
2026_HPIPH_133136_1
NIT No. 110-209 dated 01.04.2026
Open Tender
Civil Works
Item Rate
60 days
Sub Division Bhota
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Barsar
₹45,850
20 Jun 2026
1 Apr 2026
13 Apr 2026
1 Apr 2026
13 Apr 2026
1 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition below G.I.upto 1.50 Metres depth including stacking of serviceable materials and disposal of unserviceable materials within all leads and including cutting necessary reinforcement and separating from R.C.C. work within all leads and lifts & to the entire satisfaction of the Engineer-in-charge . | 22.45 | Per cum | - | - |
| 2Providing and laying cement concrete work 1:1.5:3(1cement 1.5 sand:3 graded stone aggregate 20 mm nominal size ) and curing complete excluding the cost of form work in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | |||||
| 2.01 | Foundation footing and bases of columns and the like and mass concrete within all leads and lifts & to the entire satisfaction of the Engineer-in-charge . | - | Per cum | - | - |
| 2.02 | Walls (any thickness but not less than 0.1 m thickness) attached plasters ,buttnesses ,plinth and string courses etc. from top of foundation level upto floor two level to the entire satisfaction of Engineer-in-Charge. | - | Per cum | - | - |
| 3Providing and laying cement concrete work 1:2:4(1cement:2 sand:4 graded stone aggregate 20 mm nominal size) and cuting complete in all leads & lifts to the entire satisfaction of Engineer-in-Charge. | |||||
| 3.01 | Suspended floors, roofs, landings and shelves and their supports, balconies,beams, girders, bressumers and cantilevers upto two floor level complete involving acomplete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | - | Per cum | - | - |
| 4Providing tor steel reinforcement for RCC work i/c bending,binding & placing in position complete in all respect with in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | |||||
| 5Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centering, shuttering , strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4.00 meters and removal of the same for insitu-reinforced concrete and plain concrete work in: | |||||
| 5.01 | Vertical surfaces such as wall (any thick.) partitions & the like including attached pillasters, buttresses, plinth & string courses & the like with in all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work. | - | Per sqm | - | - |
| 5.02 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. upto 200mm in thickness as per direction and to the entire satisfaction of the Engineer-in-charge. | - | Per sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
form8.pdf
Tender Documents • 1.20 MB
form6.pdf
Tender Documents • 0.45 MB
BOQ_196897.xls
BOQ • 0.35 MB
termsconditons.pdf
Additional Documents • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .