SE ETC Jhansi
132KV Substation Hansari, Lalitpur Road, Jhansi - 284135
Work of Loading of 400kV-220kV, 315 MVA Transformer from 400KV Substation Bareilly and Carriage, Unloading at 400 KV Substation Orai
2026_UPTCL_1173676_2
ETS-10/ETC(J)/2026-27
Open Tender
Electrical Works
Fixed-rate
60 days
E 400KV Substation Div Orai
As per PQR of tender documents
2 documents required · 2 mandatory
₹1,770
SE ETC Jhansi
₹93,000
14 Oct 2026
14 Oct 2026
27 Oct 2026
14 Oct 2026
27 Oct 2026
14 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Details of work for Loading of 315 MVA (BHEL make Sl. No 6005419) Transformer from 400KV Sub-Station Bareilly and Carriage, unloading at 400 KV Sub-Station Orai | - | - | 101 | - |
| 2 | Draining out of complete Transformer oil in empty oil drum from 315MVA Transformer Main Tank at 400 KV Sub-Station Bareilly . | 1 | Job | 101 | ₹101 |
| 3 | Create the Vacuum and filling of Dry Air/ Nitrogen in empty tank of transformer with -50°C due point Dry Air/ Nitrogen at 400 KV S/S Bareilly and maintained the Nitrogen pressure .25Kg/cm2 pressure upto 400 KV Sub-Station Orai. | 1 | Job | 101 | ₹101 |
| 4 | Shifting of main tank of 315 MVA Transformer from plinth to loading place Upto 20 Mtrs distance | 1 | Job | 100 | ₹100 |
| 4.01 | Additional shifting 20 Mtr @ 5 Mtrs./ Per Job | 4 | Job | 101 | ₹404 |
| 5 | Loading of 315 MVA T/F main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle at 400KV S/S bareilly . | 1 | Job | 102 | ₹102 |
| 6 | Providing of Impact Recorder before Start of Shifting of Main Tank of 315MVA T/F at 400KV Sub Station Bareilly to 400KV Sub Station Orai for checking of any Impact on Core & Winding inside the Transformer Main Tank after complete of journey. Report of Impact Recorder has to submit to Supervising Engineer within 10 Days by the Contractor. | 1 | Job | 103 | ₹103 |
| 7 | Safe Carriage of Main Tank of the 315MVA Transformer by Private Trailer to be Arranged by the Contractor from 400KV Sub Station Bareilly to 400KV Sub Station -Orai (Distance approx. 500 Km) Excluding the Cost of Transit Insurance. Transit Insurance shall be Got Done by the Contractor which shall be Reimbursed on Actual Basis. | 1 | Job | 104 | ₹104 |
| 8 | Providing services for testing of 315 MVA Transformer at 400KV Sub-Station Bareilly for
(a) Tan delta of different windings with variable frequency and submitting the report.
(b) SFRA testing after erection of the transformer and submitting the analysis/ report. | 1 | Job | 105 | ₹105 |
| 9 | Carriage of 315 MVA T/F accessories from 400KV S/S bareilly to 400KV Sub-Station -Orai distance approx. 500 Km | 1 | Job | 106 | ₹106 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
SBD.pdf
Tender Documents • 1.15 MB
BOQ_2260942.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .