Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC | ₹22.5 L | L1 | Accepted-AOC Low Quoted |
| 2 | L2₹25.5 L+₹3.0 L (13.4%)Rejected-Finance | ₹25.5 L+₹3.0 L (13.4%) | L2 | Rejected-Finance High Quoted |
| 3 | L3₹25.5 L+₹3.0 L (13.5%)Rejected-Finance | ₹25.5 L+₹3.0 L (13.5%) | L3 | Rejected-Finance High Quoted |
| 4 | L4₹27.6 L+₹5.1 L (22.6%)Rejected-Finance | ₹27.6 L+₹5.1 L (22.6%) | L4 | Rejected-Finance High Quoted |
| 5 | L5₹28.0 L+₹5.5 L (24.4%)Rejected-Finance | ₹28.0 L+₹5.5 L (24.4%) | L5 | Rejected-Finance High Quoted |
| Sl No | Description | Qty | Unit | Pazhanivel.S L4 | D.Senthilkumar L6 | Jaganraj Rajendiran contractor L1 | Rajamanivannan S L5 | T.Prakash L3 | Rajamoorthi L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers,First depth of 2m From 0 to 2 m below GL | 121.68 | Cum | 100 ₹12,168 Lowest | 263 ₹32,001.84 | 407.93 ₹49,636.92 | 300 ₹36,504 | 220 ₹26,769.6 | 263 ₹32,001.84 |
| 2.00 | Second depth of 2m From 2m to 4 m below GL | 24.34 | Cum | 250 ₹6,085 | 275 ₹6,693.5 | 473.43 ₹11,523.29 | 300 ₹7,302 | 230 ₹5,598.2 Lowest | 270 ₹6,571.8 |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers | 9.13 | Cum | 2,100 ₹19,173 | 2,343 ₹21,391.59 | 803.75 ₹7,338.24 Lowest | 2,400 ₹21,912 | 1,864 ₹17,018.32 | 2,100 ₹19,173 |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 9.13 | Cum | 5,500 ₹50,215 | 6,171 ₹56,341.23 | 7,916.43 ₹72,277.01 | 6,200 ₹56,606 | 5,031 ₹45,933.03 Lowest | 6,200 ₹56,606 |
| 5.00 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers,Below 1.5m from GL | 34.66 | Cum | 8,000 ₹2,77,280 | 9,824 ₹3,40,499.84 | 10,930.19 ₹3,78,840.39 | 6,200 ₹2,14,892 Lowest | 7,971 ₹2,76,274.86 | 9,100 ₹3,15,406 |
| 6.00 | From column and brace upto GL 0m to 1.50m below GL | 2.91 | sqm | 8,600 ₹25,026 | 9,685 ₹28,183.35 | 1,334.41 ₹3,883.13 Lowest | 9,600 ₹27,936 | 7,971 ₹23,195.61 | 9,300 ₹27,063 |
| 7.00 | 0m to 4.50m above GL | 4.38 | Cum | 9,200 ₹40,296 | 9,826 ₹43,037.88 | 1,619.09 ₹7,091.61 Lowest | 9,600 ₹42,048 | 8,089 ₹35,429.82 | 9,450 ₹41,391 |
| 8.00 | 4.50 m to 7.32 m above GL | 3.55 | Cum | 9,500 ₹33,725 | 10,104 ₹35,869.2 | 555.24 ₹1,971.1 Lowest | 9,900 ₹35,145 | 8,787 ₹31,193.85 | 10,050 ₹35,677.5 |
| 9.00 | 7.32 m to 10.98 m above GL | 3.97 | Cum | 9,600 ₹38,112 | 10,382 ₹41,216.54 | 997.81 ₹3,961.31 Lowest | 10,150 ₹40,295.5 | 9,018 ₹35,801.46 | 1,250 ₹4,962.5 |
| 10.00 | 10.98 m to 14.64 m above GL | 15.84 | sqm | 9,300 ₹1,47,312 | 10,660 ₹1,68,854.4 | 479.76 ₹7,599.4 Lowest | 10,420 ₹1,65,052.8 | 9,018 ₹1,42,845.12 | 1,050 ₹16,632 |
Tender Value
₹29.6 L
EMD Value
₹29,600
Closing Date
31 Jul 2026, 3:00 pmClosed
BDO BP SRIMUSHNAM
Block Development Office , Srimushnam
Construction of 60000 litrs OHT in kaliyamman kovil street at Madhagalirmanikam Panchayat in Srimushnam Block.
2026_RDTN_685988_1
A2/520/2026 GF 2026-27
Open Tender
Civil Works
Item Rate
SRIMUSHNAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹29,600
Yes
Panchayat union srimushnam
19 Aug 2026
15 Jul 2026
31 Jul 2026
15 Jul 2026
31 Jul 2026
15 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers,First depth of 2m From 0 to 2 m below GL | - | Cum | 263.78 | - |
| 2 | Second depth of 2m From 2m to 4 m below GL | 24.34 | Cum | 2,445.47 | ₹59,522.74 |
| 3 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers | 9.13 | Cum | 6,309.66 | ₹57,607.2 |
| 4 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 9.13 | Cum | 6,341.13 | ₹57,894.52 |
| 5 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers,Below 1.5m from GL | 34.66 | Cum | 6,434 | ₹2,23,002.44 |
| 6 | From column and brace upto GL 0m to 1.50m below GL | 2.91 | sqm | 2,445.47 | ₹7,116.32 |
| 7 | 0m to 4.50m above GL | 4.38 | Cum | 6,309.66 | ₹27,636.31 |
| 8 | 4.50 m to 7.32 m above GL | 3.55 | Cum | 6,341.13 | ₹22,511.01 |
| 9 | 7.32 m to 10.98 m above GL | 3.97 | Cum | 2,445.47 | ₹9,708.52 |
| 10 | 10.98 m to 14.64 m above GL | 15.84 | sqm | 6,309.66 | ₹99,945.01 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TechnicalBid.pdf
Tender Documents • 0.62 MB
BOQ_824589.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .