Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical AsPerGuidelinesOfSHGScheme |
| 2 | Accepted-Technical | Accepted-Technical AsPerGuidelinesOfSHGScheme |
| 3 | Accepted-Technical | Accepted-Technical AsPerGuidelinesOfSHGScheme |
Tender Value
₹61.3 L
EMD Value
₹1.2 L
Closing Date
22 Feb 2019, 2:00 pmClosed
Executive Engineer ED-IIIrd, Shereen Bagh Srinagar
Executive Engineer Electric Division-IIIrd, Shereen Bagh Srinagar
Providing and Installation of Street Lighting System, with complete Electrical infrastructure for LED type lighting fixtures on 9 meter long Octagonal poles Center verge, UG/ overhead, Road Edge,details mentioned in e-NIT Notice and SBD.
2019_PDD_70743_1
e-NIT No.ED-III/94 of 2018-19 Dt. 06-02-2019
Open Tender
Electrical Works
Turn-key
45 days
Executive Engineer ED-IIIrd, Shereen Bagh Srinagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Executive Engineer ED-IIIrd, Shereen Bagh Srinagar
₹1.2 L
20 Mar 2019
7 Feb 2019
23 Feb 2019
7 Feb 2019
22 Feb 2019
16 Feb 2019
8 Feb 2019 - 15 Feb 2019
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.36 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .