Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹20.8 L
EMD Value
₹41,606
Closing Date
12 Oct 2026, 11:00 am3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Block Development Officer
Block Development Officer Kalimpong I Dev. Block
Construction of Structure for Parking facility at Ground Floor and Store room at Basement in front of the Kalimpong-I Developemnt Block office
2026_DMK_5076757_1
BDO/KPG-I/DEV./eNIT-09/2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
kalimpong
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹41,606
Yes
30 Sept 2026
30 Sept 2026
14 Oct 2026
30 Sept 2026
12 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ref. CPWD/Item no. 15.2.2, P no. 220 Vol.2 DSR-2023 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | 20.25 | m3 | 1,503.6 | ₹30,447.9 |
| 2 | Ref. CPWD/Item no. 2.1.1 P no.87 Vol.1 DSR-2023 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil | 35.64 | m3 | 129.85 | ₹4,627.85 |
| 3 | Ref.CPWD/Item no. 2.25 Page no.90 Vol. 1 DSR-2023 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 7.13 | m3 | 196 | ₹1,397.48 |
| 4 | Ref.CPWD/Item no. 2.27 Page no. 90 Vol. 1 DSR-2023 Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. | 5.61 | m3 | 2,123.75 | ₹11,914.24 |
| 5 | Ref.CPWD/Item no. 11.2 Page no. 175 Vol. 1 DSR-2023 Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 74.83 | m2 | 792.05 | ₹59,269.1 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (Zone-III) delivered from natural sources : 6 graded stone aggregate 20 mm nominal size delivered from natural sources). | 4.75 | m3 | 7,294.7 | ₹34,649.83 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.44 | m3 | 9,045.75 | ₹1,03,483.38 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.85 | m3 | 10,852.95 | ₹30,930.91 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 28.72 | m3 | 11,505.5 | ₹3,30,437.96 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1: Foundations, footings, bases of columns, etc. for mass concrete | 20.22 | m2 | 392.15 | ₹7,929.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_5171154.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .