Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-AOC | L1 | Accepted-AOC First Lowest bidder Mr. MRUNAL BHARAT BENDRE has been awarded for this contract. | |
| 2 | L2₹26.7 L+₹23,781.32 (0.90%)Rejected-Finance | L2 | Rejected-Finance This bidder has been quoted 2nd highest amount for this tender. There for this bidder has been Rejected for this tender | |
| 3 | L3₹27.0 L+₹50,205.01 (1.90%)Rejected-Finance | L3 | Rejected-Finance This bidder has been quoted 1st highest amount for this tender. There for this bidder has been Rejected for this tender |
Tender Value
Refer Docs
EMD Value
₹26,424
Closing Date
29 Apr 2026, 5:00 pmClosed
Chief Officer, Jawhar Municipal Council
Jawhar Municipal Council Office, Jawhar
Renovation of Kitchen Shed in Gymnashiam Hall Near S.T. Stand for Jawhar Muncipal Council, Taluka Jawhar District Palghar.
2026_DMA_1297032_1
Ow/E-Notice/757/2026-27-10
Open Tender
Civil Works
Percentage
90 days
Jawhar
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,950
₹26,424
23 Sept 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
29 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Item No. 1 - Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . | - | Square Metre | - | - |
| - | Item No. 2 - Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | - | Cubic Metre | - | - |
| - | Item No. 3 - Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | Cubic Metre | - | - |
| - | Item No. 4 - Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. | - | Cubic Metre | - | - |
| - | Item No. 5 - Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | - | Cubic Metre | - | - |
| - | Item No. 6 - Providing and fixing factory made Hydraulically pressed Mechanically vibrated and compacted precast inter locking cement concrete paving blocks 80MM thick in M-40 grade of approved size and shape for City streets, small /medium market roads,low volume roads, utility cuts on arterial roads etc. as specified and as per IS 15658:2006 including cost of all materials, manufacturing, curing, transportation of blocks to work site including loading, unloading and stacking as directed, laying paving blocks in position over prepared bed of natural sand / crushed sand of 50 mm thickness including necessary excavation in all stratas, spreading blindge of fine sand over the prepared bed, compacting blocks by plate vibrator etc. complete. | - | Square Metre | - | - |
| - | Item No. 7 - Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. | - | Number | - | - |
| - | Item No. 8 - Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete. | - | Square Metre | - | - |
| - | Item No. 9 - Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | - | Square Metre | - | - |
| - | Item No. 10 - Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. | - | Number | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.10 MB
Tendernotice_2.pdf
PDF • 2.13 MB
BOQ_2228067.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .