Loading…
Loading…
Tender Value
₹11.8 Cr
EMD Value
₹5 L
Closing Date
21 Aug 2026, 5:00 pm
MR Yognarayan sahu(DFLT)
CE(Baster)
CONSTRUCTION OF ISOLATION BAY AND ISOLATION BAY CONNECTING ROAD AT MAA DANTESHWARI AIRPORT JAGDALPUR.(DEPOSITE WORK) (Without Escalation and Bonus)
196810
NIT No. 745/TC/EinC/PWD/26-27
RESTRICTED TENDER
WORKS
PERCENTAGE
4 days
CE(Baster)
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
17 documents required · 17 mandatory
Public Works Department (PWD)
WORKS
MR Yognarayan sahu(DFLT)
RESTRICTED TENDER
PERCENTAGE
A
CE(Baster)
PWD Bastar Circle, Jagdalpur
Uttar Baster Div. No. 1 Jagdalpur
120
04
No
0
196810
21 Aug, 2026 5:00:00 PM IST
27 Aug, 2026 10:00:00 AM IST
5 Aug, 2026 5:00:00 PM IST
NIT No. 745/TC/EinC/PWD/26-27
CONSTRUCTION OF ISOLATION BAY AND ISOLATION BAY CONNECTING ROAD AT MAA DANTESHWARI AIRPORT JAGDALPUR.(DEPOSITE WORK) (Without Escalation and Bonus)
500000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
118301000.00
2
25 Aug, 2026 5:00:00 PM IST
118301000
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
16d 13h 5m
17 documents required · 11 mandatory · 6 optional
₹0
₹5 L
4 Aug 2026
4 Aug 2026
27 Aug 2026
5 Aug 2026
25 Aug 2026
Clearing Grass and Removal of Rubbish (clearing grass and removal of rubbish including all leads and lifts)
Demolishing stone rubble masonry including arches, stacking of serviceable material and disposal of unserviceable material within 50 Metres lead. In cement mortar
Excavation in Soil (by Mechanical Means.) Excavation for roadway in soil using mechanical means including loading in tipper for carrying of cut earth to embankment site and unloading with all leads & lifts as per relevant clauses of section 300.
Transportation of metal i/c loading & unloading For a lead upto 1 Km. Beyond 1 Kms. and upto 10 Kms.(Add extra for every 1 Km.) Transportation of different other material i/c loading & unloading Masonry stones
Transportation of metal i/c loading & unloading For a lead upto 1 Km. Beyond 1 Kms. and upto 10 Kms.(Add extra for every 1 Km.) Transportation of different other material i/c loading & unloading Masonry stones
Lime, Fly ash stabilized soil sub-base Construction of Sub-base using lime-fly ash admixture with granular soil, free from organic matter/ deleterious material or clayey silts and low plasticity clays having PI between 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at site or pre-slaked with CaO content not less than 50%, fly ash confirming to gradation as per clause 4.3 of IRC: 88, lime + fly ash content ranging between 10 to 30%, the minimum unconfined compressive strength and CBR value after 28 days curing and 4 days soaking not to be less than 7.5kg/cm2 and 25% respectively, all as specified in IRC: 88.
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401. Plant mix method (with Mechanically crushed stone only) For Lower Sub-base with Grading-V Material
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406.
Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe complying to IS:458, with ends casted as per the requirements of flush jointing of pipes for culverts including joints duely filled and finished with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 450 mm dia
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub-base as per IRC:SP-49 over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601.
Cement Concrete Pavement Construction of unreinforced, dowel jointed, plain cement concrete pavement as per IRC:58 over a prepared sub-base, coarse and fine aggregate conforming to IS:383 and graded as per table 600-3 mixed in a batching and mixing plant as per approved mix design, transported to site, laid with slip form / fixed form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per clause 602. Using Fixed Form Paver With Cement concrete grade M-40 and minimum cement content @ 400 kg/cum.
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paing of superior make at appproved by the engineer in charge i/c cleaning the surface of ail dirt,scales oil,grease and other foreign material etc.and lining out complete
Construction of RCC drain/cover slab/chamber Excavation for drain chamber by Mannual means (Earth work in excavation for drain/chamber as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Construction of RCC drain/chamber/cover, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications excluding reinforcement, with RCC M-20
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in drain/cover/chamber complete as per Drawing and Technical Specifications.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness if required and as per relevant clauses of section-200. In area of light jungle
Prime coat Providing and applying primer coat with bitumen emulsion (SS-1, grade confirming to IS:8887) on prepared surface of granular base including clearing of road surface and spraying primer using mechanical meansasperclause502. on WBM/WMM surface @0.85 Kg/sqm.
Tack coat Providing and applying tack coat with bitumen emulsion (RS-1, grade confirming to IS:8887) using emulsion pressure distributor on the prepare dbituminous/granular surface cleaned with mechanical broom and asperclause 503. Granular surfaces treated with primes @ 0.30 kg /Sqm
Dense Bituminous Macadam (Providing and laying dense bituminous macadam with minimum 40-60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.505 complete in all respects.) With mechanical paver finisher for Grading-II(26.5 mm nominal size bitumen content 4.50%)
Bituminous Concrete (Providing and laying bituminous concrete with minimum 40-60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.0 to 6.0% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) With mechanical paver finisher for Grading II (13.2 mm nominal size) with bitumen 6.0 %
Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-1997. The finished surface to be level, uniform and free from streaks and holes.)
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ) Over 10 cm in width
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing , removal of stumps and other deleterious matter , dressing of sides and bottom and backfilling with approved material including dewatering etc. complete. Ordinary soil Upto 3 m depth
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. Using concrete mixer
Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags). Well steining Using batch type concrete mixer with integrated weigher. P.C.C. Grade M-20
Well steining Using concrete Mixer P.C.C. Grade M-25
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification sections 1500, 1600 and 1700 (Newly laid concrete shall be covered by gunny bags). RCC Grade M25 For Solid Slab Super Structure Using Concrete Mixer Height upto 5m
Supplying, fitting and placing HSD bar reinforcement in super-structure complete as per drawing and technical specifications as per section 1600
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications as per relevant clause of section 2700.
Providing and fixing in position tar paper bearing for slab as per approved drawings and specification
Filler joint Providing & fixing 20 mm thick compressible fiber board (12m long x 25 cm deep ) in expansion joint complete as per drawing & Technical Specification.
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia. AC pipe, extending through the full width of the structure with slope of 1 V: 20 H towards drawing face. Complete as per drawing and Technical specifications section 2706 and 2200.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specifications 710.1.4 of I.R.C. 78 and 2200.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification 710.1.4 of I.R.C. 78 and 2200. (i) Granular material
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.10 MB
1657398917816320750_193444_PQ.doc
NIT • 0.21 MB
3260510375348766858_193444_Form A.doc
NIT • 0.16 MB
3662590503382863201_153213_1258250143523725404_129113_Guidelines_to_Bidders_EPS_v1.pdf
NIT • 0.13 MB
6762300149554829543_193444_NIT.doc
NIT • 0.29 MB
7894685009757329652_196810_Notice.doc
NIT • 0.11 MB
3582486347644446639_193444_BOQ.xlsx
BOQ • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].