Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.0 L+₹1.4 L (18.9%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Experience Certificate are not enclose hence bid is Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Labor Certificate are not enclose hence bid is Rejected |
| Sl No | Description | Qty | Unit | ABHINANDA POWER DISTRIBUTION PRIVATE LIMITED L1 | IKRAM ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00DECENTRALISED ITEM (Exclusive GST) | |||||
| 1.01 | Dead End with Eye Hook | 12 | No | 3,600 ₹3,600 Lowest | 5,232 ₹5,232 |
| 1.02 | Suspension Clamp with Eye Hook | 19 | No | 3,990 ₹3,990 Lowest | 6,764 ₹6,764 |
| 1.03 | Piericing Connector Size 16/50/95/120 sqmm ABC | 52 | No | 2,080 ₹2,080 Lowest | 3,380 ₹3,380 |
| 1.04 | 1x16 SQ mm LT XLPE Cable | 52 | No | 2,080 ₹2,080 Lowest | 3,120 ₹3,120 |
| 1.05 | Stay Clamp | 34 | No | 8,500 ₹8,500 Lowest | 10,336 ₹10,336 |
| 1.06 | Stay Insulator | 34 | No | 1,020 ₹1,020 Lowest | 1,292 ₹1,292 |
| 1.07 | Cross arm Holding Clamp | 30 | No | 7,200 ₹7,200 Lowest | 7,800 ₹7,800 |
| 1.08 | F-bracket | 30 | No | 5,400 ₹5,400 Lowest | 6,750 ₹6,750 |
| 1.09 | Clamp for Chanell | 82 | No | 14,350 ₹14,350 Lowest | 16,236 ₹16,236 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
9 Sept 2025, 4:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle, Sankabirnagar
Work of installation of several new distribution transformers for smooth power supply EDD-KLD
2025_PVVNV_1068616_1
13/EDC(SKN)/2025-26
Open Tender
Electrical Works
Fixed-rate
90 days
Santkabirnagar
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
SE EDC SKN
₹11,000
27 Sept 2025
26 Aug 2025
10 Sept 2025
26 Aug 2025
9 Sept 2025
26 Aug 2025
DECENTRALISED ITEM (Exclusive GST)
Dead End with Eye Hook
Suspension Clamp with Eye Hook
Piericing Connector Size 16/50/95/120 sqmm ABC
1x16 SQ mm LT XLPE Cable
Stay Clamp
Stay Insulator
Cross arm Holding Clamp
F-bracket
Clamp for Chanell
Aluminum Lug size 150 SQ mm
Aluminum Lug size 240 SQ mm
Top Channel
Dropper Channel
S/S Base angle
T-off Channel
WORK DETAILS AND RATES(EXCLUDING GST) (उक्त कार्य के निष्पादन मे प्राक्कलन एवं इस सूची मे दर्ज सामग्री के अतिरिक्त यदि कोई अन्य टी एंड पी आइटम विकेंद्रीयकृत सामग्री की आवश्यकता पड़ती है तो कार्यदायी संस्था द्वारा उपलब्ध कराते हुये कार्य को ससमय पूर्ण करा लिया जायेगा एवं कोई अतिरिक्त धनराशि देय नहीं होगh
Carriage of Conductor/Material From Store To Site
Carriage of PCC/STP Pole From Store To Site
Carriage of 25 KVA Distrubution Transformer From Store To Site
Carriage of 100 KVA Distrubution Transformer From Store To Site
Carriage of 250 KVA Distrubution Transformer From Store To Site
Mounting of 25 KVA Distribution Transformer at DP/ with Channel and Clamp
Mounting of 100 KVA Distribution Transformer at DP/ with Channel and Clamp
Mounting of 250 KVA Distribution Transformer at Plinth
Laying of New ABC With all Accessories (Including Distribution Box with Connecting Cable)
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Construction of Transformer plinth for 250 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials.
Fencing of T/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing
Pipe Earthing for 250KVA D/T With Material and Labour (40 Feet Depth connecting With G.I Strip including bentonite, silica, charcoal, salt, and graphite-based compounds.
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering
Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works.
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Earthing of Poles
IKRAM ENGINEERING WORKS (BID ID -5518193)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .