Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC DOOR NO 3 386 THAGAVEL RICE SHOP NALLAMPALLI VILLAGE AND POST NEAR SINGARAN KALYANAMANDABAM NALLAMPALLI POST DHARMAPURI T K AND D T 636807 | NALLAMPALLI | DHARMAPURI | TAMIL NADU | 636807 | ₹1.1 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.3 CrRejected-Finance NO 116 A MAJJID KOVIL STREET PENNAGARAM DHARMAPURI DT 636 810 | DHARMAPURI | TAMIL NADU | 636810 | ₹1.3 Cr | 2 | Rejected-Finance L2 |
| 3 | 3₹1.4 CrRejected-Finance DOOR NO 3 92 VARAGANAPALLI VILLAGE NAGAMANGALAM POST DENKANIKOTTAI TALUK KRISHNAGIRI DISTRICT 635113 | DENKANIKOTTAI | KRISHNAGIRI | TAMIL NADU | 635113 | ₹1.4 Cr | 3 | Rejected-Finance L3 |
| 4 | 4₹1.4 CrRejected-Finance | ₹1.4 Cr | 4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sarasvathi Construction L1 | T.Varadharaj Contractor L3 | T JAYAPRAKASH CIVIL CONTRACT WORKS L2 | GEMINI & CO L4 |
|---|---|---|---|---|---|---|---|
| 1.00Work items | |||||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 4,273.2 | Sqm. | 5.13 ₹21,921.52 | 6.43 ₹27,476.68 | 7.51 ₹32,091.73 | 9 ₹38,458.80 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out | 2,559.6 | M³ | 117.16 ₹3.0 L | 133.27 ₹3.4 L | 155.89 ₹4.0 L | 165 ₹4.2 L |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction etc completed | 1,279.8 | M³ | 242.4 ₹3.1 L | 344.68 ₹4.4 L | 348.93 ₹4.5 L | 360 ₹4.6 L |
| 5.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 2,904.25 | M³ | 1,959.4 ₹56.9 L | 2,320.44 ₹67.4 L | 2,250 ₹65.3 L | 2,280 ₹66.2 L |
| 6.00Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | |||||||
| 7.00 | Km 0/0-1/0 | 284.6 | M³ | 2,020 ₹5.7 L | 2,845.62 ₹8.1 L | 2,932 ₹8.3 L | 2,950 ₹8.4 L |
| 8.00 | Km 1/0-2/0 | 283.95 | M³ | 2,060.4 ₹5.9 L | 2,857.3 ₹8.1 L | 2,949.17 ₹8.4 L | 3,000 ₹8.5 L |
| 9.00 | Km 2/0-3/0 | 283.05 | M³ | 2,100.8 ₹5.9 L | 2,868.25 ₹8.1 L | 2,959.85 ₹8.4 L | 3,100 ₹8.8 L |
| 10.00 | Km 3/0-4/0 | 283.5 | M³ | 2,141.2 ₹6.1 L | 2,879.21 ₹8.2 L | 2,970.53 ₹8.4 L | 3,200 ₹9.1 L |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
20 Feb 2026, 3:00 pmClosed
The Wildlife Warden, Hosur
O/o. the Wildlife Warden, Hosur Forest Division, Mathigiri, Hosur - 635110.
Providing single layer WBM road from Melur to Tholuvabetta road from km 0/0 4/740 of Tholuvabetta and Gullatty Reserved Forests in Denkanikottai Range, Denkanikottai Taluk under Krishnagiri DMFT Fund during 2025-26 and 2026-27
2026_TNFD_652728_1
CCF, Dharmapuri C.S.O No. 01/2025-2026
Open Tender
Civil Works - Roads
Tholuvabetta village
As mentioned in tender document
8 documents required · 8 mandatory
₹0
₹1.4 L
11 Mar 2026
14 Feb 2026
21 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Work items
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction etc completed
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Provision for KM Stones of size 0.75m x 0.23m x 0.10m
Provision for HM Stones of size 0.75m x 0.23m x 0.10m
Provision for Name board charges
Provision for sign board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TenderDocument.pdf
Tender Documents • 0.53 MB
Schedule.pdf
Additional Documents • 0.17 MB
BOQ_782705.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid