Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹48.3 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹49.9 L+₹1.6 L (3.39%)Rejected-AOC HARYANA HR | FATEHABAD | HARYANA | 125106 | 2 | Rejected-AOC 2 | |
| 3 | 3₹50.0 L+₹1.8 L (3.66%)Rejected-AOC VPO NEEMAR BADESRA TEHSIL BADHRA AND DISTT CHARKHI DADRI 127308 | CHARKI DADRI | HARYANA | 127308 | 3 | Rejected-AOC 3 | |
| 4 | 4₹51.1 L+₹2.9 L (5.93%)Rejected-AOC | 4 | Rejected-AOC 4 | |
| 5 | 5₹56.0 L+₹7.7 L (15.9%)Rejected-AOC | 5 | Rejected-AOC 5 |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
9 Jun 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MGC W/S Division, Mahendergarh
Executive Engineer MGC W/S Division, Mahendergarh
Rehabilitation of Dewas Disty. from Km. 0.000 to 3.253 (tail)
2021_HRY_174355_1
1993-2009/6A dated 01.06.2021
Open Tender
Civil Works
Item-rate/Agreement basic
120 days
Executive Engineer MGC W/S Division, Mahendergarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹1.1 L
Yes
28 Jun 2021
4 Jun 2021
10 Jun 2021
4 Jun 2021
9 Jun 2021
4 Jun 2021
90 days
Amount
Earth work excavation in all kind lead of soil I/C all lead/lift & other allowance with an average lead of 495 Mtr. ( HSR Item No. 6.2)
E/Work In filling gaps in an average depth of 1.00 feet area of gaps as detail an avg. Lead of 15 Mtr with compaction. (HSR Item No. 6.2 b) @ 586.60+425% = 3079.65
Earth Work in excavation in foundation, trenches etc. in all kind of soils, not exceeding 2 meters depth including dressing of bottom and sides of trenches stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6).
C.C. 1:4:8 with stone aggregate 40 mm nominal size in F&P (HSR Item No. 10.39) @ 403.10+450% = 2217.05
Providing & placing in position/design mix cement concrete lining of grade M-15, with minimum cement contents 240 Kg./Cum, 75 mm thick manually in curve portion & side slopes, mixing, transporting, vibrating, smooth finishing curing of lining by water, striking of joints, watering and brushing the lined surface on side slopes including dewatering/pumping out of water caused by rain water required & including cost of all materials, labour, machinery, watering & compacting side slopes including collecting debris & disposed off collected material outside the channel as per approved design and specifications. (Rate as per Rate of Analysis attached)
Cement Plaster 10mm thick in cement sand mortar 1:5 (Rate as per Rate of Analysis attached)
Laying C.C M-15 with minimum cement contents 240 Kg/Cum for coping 100mm thick 230 mm wide (Rate as per Rate of Analysis attached)
Filling expention joints with special imperivous hotpour 12mm wide (HSR Item No. 19.17) @ 0.35+450% = 1.92
Dismantling of Brick lining in cement.HSR 8.5(b)@35.60+550% = 231.40
First class brick work laid in cement sand marter 1:3 in foundation and plinth (HSR 11.5) @ 461.40+650% = 3460.50
First class brick work laid in cement sand marter 1:4 in foundation and plinth (HSR 11.4) @ 424.60+650% = 3184.50
Cement concrete 1:1.5:3 with stone agg. 20mm nominal size for reinforced concrete work in slabs with in clination notexceeding 25 degree etc. with horizantel (HSR 10.82+10.95 a) @ (997.90+86.90)+450% = 5966.40
Cement concrete 1:2:4 with stone agg. 20mm nominal size in foundation and plinth (HSR 10.41). @ 615.60+450% = 3385.80
Cold twisted deformend bars for RCC works where not included in the complete rate of RCC including bending, binding and placing position complete (HSR 18.22) @ 927.05+500% = 5562.30
12 mm thick cement plaster in 1:5 (HSR 15.6) @ 11.60+600% = 81.20
White washing two coats. (HSR 16.47) @ 0.90+230% = 2.97
Providing and fixing PVC pipe for outlet
Earth work for compaction HSR 6.2 (g) (ii) (v) & (viii)
Removing hume pipe 300/600 dia pipe NP2/NP3 [HSR 8.35 (b)] @ 8.30+550% = 53.95
Removing hume pipe 600/900 dia pipe NP2/NP3 [HSR 8.35 (c)] @ 11.75+550% = 76.37
Credit of Material (Tile Work)
Credit of Material (Brick Work)
Credit of Material (Pipe )
RAJESH SANGWAN
THE BABA HARI DASS CO OP L AND C SOCIETY LTD
The Narnaul Mohalla Rao Ka Coop L&C Society Ltd., Narnaul
SUKHBIR SINGH CONT
THE BAWANI KHERA INSAN CO-OP. L&C SOCIETY LTD.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .