Tender Value
₹10.2 L
EMD Value
₹10,169
Closing Date
21 Jun 2026, 5:00 pm7d left
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
Repair and Renovation of Bhaskarganj youth Club in W.N-21
2026_ORULB_131363_74
BM_08_2026_27
Open Tender
Civil Works - Roads
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,169
Yes
10 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
21 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in ordinary soil within 50met. Initial lead and 1.5met. Initial lift including rough dressing and levelling the bed including all labour T&P etc. complete as directed by the Engineer - in Charge. | 27.17 | Cum | 210.52 | ₹5,720.25 |
| 2 | Filling in foundation and plinth with sand well watered,rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 20.72 | Cum | 1,080.6 | ₹22,394.35 |
| 3 | Cement concrete (1:3:6) using: 4cm size hard granite hand broken metal with all cost conveyance,royalty,taxes etc all complete. | 9.42 | Cum | 6,224.35 | ₹58,650.18 |
| 4 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. | 25.3 | Cum | 6,448.33 | ₹1,63,164.67 |
| 5 | Supplying , fitting , fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete. | 22.77 | Qntl | 9,372.95 | ₹2,13,450.19 |
| 6 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. | 41.71 | Sqm | 249.83 | ₹10,420.41 |
| 7 | Supplying all labour T&P material for Rigid & smooth Shuttering for Column/Beam in superstructure | 67.95 | Sqm | 1,219.7 | ₹82,878.62 |
| 8 | Supplying all labour T&P material for Rigid & smooth Shuttering for Lintel Beam incl all cost | 9.86 | Sqm | 577.75 | ₹5,698.35 |
| 9 | Supplying all labour T&P material for Rigid & smooth Shuttering for Roof Slab incl all cost | 69.64 | Sqm | 769.19 | ₹53,566.39 |
| 10 | Supplying all labour T&P material for 1st ClassFly Ash Bricks in CM (1:6) in foundation and plinth | 1.7 | Cum | 5,704.98 | ₹9,684.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_595693.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid