| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹3.3 Laccepted-aoc | ₹3.3 L | accepted-aoc |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
4 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
IRRIGATION DIVISION NO.4, GADWAL
RDS-Repairs and Reconstruction of OT sluices and shuttering arrangements to D-37 at Km.127.80 on RDS canal (includes EM parts, Gate, Hoist with gear box Mechanism) in Undavelly (M), Jogulamba Gadwal District
696698
T.No.05/2026-27, Date:-20.04.2026
OPEN
Fabrication and Erection of Structural Steel
JOGULAMBA GADWAL
7 documents required · 7 mandatory
₹123
₹3,500
19 May 2026
24 Apr 2026
25 Apr 2026
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth up to 3 meters)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Sub/Super structure works including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 50 m and all lifts. ( Cement content : 280 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.45 cum)
Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery,labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to densitycontrol of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
Demolishing and disposal of unserviceable materials within 100 metres lead Unreinforced cement concrete up to 15cm thickness for finished item of work
OT SLUICE EM PARTS:Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings. (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)
OT SLUICE GATES: Fabrication, supply, erection, testing and commissioning of Sluice Shutters consisting of skin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)
OT SLUICE Screw Gear box, Hoist and Hoist Platform: Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure, platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete
PAINTING E.M Parts: Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Protective Mastic to athickness of 70+5 microns coats 2 coats with coal tar epoxy each coat with a DFT of 150+5 microns and total DFT of all coats including Primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts
PAINTING OF GATES: Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Protective Mastic to athickness of 70+5 microns coats 2 coats with coal tar epoxy each coat with a DFT of 150+5 microns and total DFT of all coats including Primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts
Painting of OT SLUICE Screw Gear box, Hoist and Hoist Platform: Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 2 coats with coal tar epoxy with material, labour, and all accessories with all leads and lifts
Lubricants for all OT shutters from D35 to D40 yearly maintenance
Grease for all OT shutters from D35 to D40 yearly maintenance
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
~$cument.docx
TENDER_DOCUMENT • 0.00 MB
boq.xls
TENDER_DOCUMENT • 0.03 MB
Document.docx
TENDER_DOCUMENT • 0.25 MB
Schedule.xls
TENDER_DOCUMENT • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .