Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | Admitted-Finance |
Tender Value
₹7.2 L
EMD Value
₹7,000
Closing Date
27 May 2020, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Erection of 63 MVA T/F after dismantling of 40 MVA T/F and other associated works at 132 KV Sub-Station Odpura Under ETD Hathras
2020_UPTCL_473771_1
ET-21/ETC(M)/20-21
Open Tender
Electrical Works
Lump-sum
30 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE ETD Mathura
₹7,000
29 May 2020
21 May 2020
27 May 2020
21 May 2020
27 May 2020
21 May 2020
120 days
Shifting of nitogen filled main tank of 63 MVA,132/33 KV transformer at 132 KV S/S Sarsol, Aligarh up to the loading site (distance up to 20 Mtrs), Including turning of tank if required; all T&P and other related works required to complete the job shall be arranged by the contractor at his own cost..
Additional shifting of 5 Mtrs or part.
Loading of nitogen filled 63 MVA,132/33 KV transformer main tank, at 132 KV S/S Sarsol, Aligarh; on a soft, flat surface like wooden sleeper bed; on suitable private carrier vehicle/Trailer. Work include jacking the transformer tank for placing wooden sleeper under the tank and simultaneously lifting the tank till the wooden platform come in alignment of Trailer bed, safe shifting of main tank from wooden sleeper patform to Trailer bed on rails, then removal of rails etc form under the tank after complete shifting. Tying up of main tank with the help of turnbuckle and steel slings at all tying points, covering main tank body with tarpaulin and all other related work for confirm safety of tank during transport. Trailer, T&P and all other material shall be arranged by the contractor at his own cost.
Safe carriage of Nitrogen filled 63 MVA, 132/33 KV transformer main tank in suitable private carrier vehicle/Trailer from 132 KV S/S Sarsol, Aligarh to 132 KV S/S Odpura, Hathras (approximate distance 50 KM) after getting insurace of material in favour of UPPTCL with worth atleast actual cost and taxes. Insaurance shall be got done by the cotractor at his own cost as per direction of supervising engineer and the cost of insaurance shall be reimbrused as actual by UPPTCL on submitting the related documents and bills. Trailer, T&P and all other material shall be arranged by the contractor at his own cost.
Unloading of nitogen filled 63 MVA,132/33 KV transformer main tank, at 132 KV S/S Odpura, Hathras from carrier vehicle/Trailer. Work include preparaing wooden sleeper bed on ground upto suitable height, uncovering, opening turnbuckle and steel slings from all tying points, jacking main tank, placing rails, shifting main tank from Trailer bed to ground wooden sleeper bed, jacking the transformer main tank, removing rails and sleeper one by one and preparing track for dragging. Work shall be carried out with proper safety and as per manufacturer guidelines. All material and T&P shall be arranged by the contractor at his own cost.
Dismantling of welded wiremesh fencing with concertina ring and angle frame and brick toe wall installed around 40 MVA T/F (ALSTOM) in such a way that the dismantlled material can be used again. Stacking of all dismantlled material at proper place.
Dismantling of pale fencing at suitable location before main gate of switchyard for entry of trailer carrying 63 MVA Nitrogen filled transformer and stacking of dismantled material at proper place in store. Work include cutting, welding etc.
Dismantling of jumpers of 40 MVA T/F (ALSTOM), at 132 and 33 KV CTs, LV side LA and binding them properly to prevent unnecessary movement.
Dismantling the accessories of 40 MVA 132/33 KV transformer after opening of jumpers, removal of earthing, opening of cable connections, marshalling box, RTCC panels etc. blanking the radiators etc with proper gaskets along with nuts and bolts to complete the job satisfactory, including proper stacking, Blanking plates, nuts and bolts shall be provided by the department and all other T&P etc. shall be arranged by the contractor at his own cost as per Technical Specification.
Shifting of nitrogen filled main tank of 40 MVA 132/33 transformer (ALSTOM) from plinth up to 20 meters distance including all T&P and all other works required to complete the job satisfactory as per Technical Specification.
Additional shifting of approx. 5 Mtrs or part thereof including turning. if any.
Dismantling of 132 KV CT amd 33 KV CTs including opening all cable connections, earthing and shifting CTs from site to store.
Shifting of main tank of 63 MVA,132/33 KV transformer on the plinth distance about 20 meter including turning of tank if required, including all T&P and all other works required to complete the job satisfactorily.
Additional shifting of approx. 5 Mtrs or part thereof including turning. if any.
Creating vacuum in Nitrogen filled 63 MVA 132/33 KV MVA T/F up to level of 760 mm. Hg for at least 24 hours. Vaccum pump shall be provided by the contractor at his own cost.
Drainning out 17.5 KL old 40 MVA transformer's (ALSTOM) oil from 20 KL tank in to 209 ltr drums.
Draining out fresh transformer Oil from 209 Ltr. drums to 20 KL tank.
Centrifuging of complete fresh transformer oil in 20 KL storage tank and transformer main tank for approx 48 and 72 hours by 10 KL/Hour capacity centrifuging machine, to be arranged by the contractor alongwith operator and taking the B.D.V values of the oil periodically till the required value is achieved as per direction of supervising engineer.
Filling of approximate 20 KL fresh centrifuged transformer oil in 63 MVA T/F during vacuum breaking process and after complete errection of transformer as per direction of supervising engineer.
Complete erection of 63 MVA capacity transformer by erection of radiators conservator tanks, all bushing, turrets, connecting oil pipe lines, cooling fans, motor drive mechanism of tap changer, RTCC panel, etc to complete the job satisfactory.
Construction of grounded Delta 100 cm in depth for grounding HV and LV neutrals of 63 MVA transformer using 03 Nos. 40mm2 MS round bar 01 meter apart form each other in equilatral triangle shape and each round surrounded by 30 mm thick mixture of calcium chloride and wood charcoal in equal proportion, work include digging/drilling, cutting , bending, welding and other associated work to complete the work satisfactorily. MS round and flat will be provided by department free of cost and all other material shall be provided by the contractor at his own cost.
Earthing of 63 MVA T/F LV and HV neutrals with help of 75x10mm MS flat connected with separate delta and earthing of main tank body at two separate points, marshaling box, drive mechanism etc. with 75X10/50X6 MS flat. Work include excavation, cutting, bending, straightening, welding and preparing suport for MS flats from gruond to top of main tank. All material except MS flat shall be provided by the contractor at his own cost.
Erection of 132 KV CTs(3 Nos) and 33 KV CTs(3Nos), work Include shifting of CTs from store to site, cable connection, earthing etc.
Jumpering of 63 MVA transformer on HV side with single panther conductor and LV side with twin zebra conductor.
Termination of following 2.5 Sq.mm. of cable as per cable schedule including making necessary holes in glands places of box wherever required, providing ferrules and nos for each core (the rate of termination of control cable including all cores of cable at one end with lug.), cable glands & ferules will be provided by the contractor.
(A) Opening of termination in old system
Cotrol cable 2×2.5 mm², 4×2.5 mm², 6×2.5 mm², 10×2.5 mm²
(B) Termination of cables for new system
Cotrol cable 2×2.5 mm², 4×2.5 mm², 6×2.5 mm², 10×2.5 mm²
Laying of fresh control cables of size 2x2.5mm², 4×2.5 mm², 6x2.5 mm² with proper saddling and tagging.
Loading, Unloading and safe Carriage of following Items in pvt. Carrier vehicle from 220 KV S/S Meetai to132 KV S/S Odpura, Hathras, approximate distance 10 KM.
(A) 33 KV CT CTR 2000-1250/1 A- 04 Nos
(B) 132 KV CT CTR 800-400/1 A- 03 Nos
(C) 209 ltr empty drum- 90 Nos
The following works are required for fabrication and erection of welded wiremesh with concertina ring around 63 MVA T/F for protection from monkies.
(A) Casting of foundation of size 0.3x0.3x0.5 mtr., work include excavation, fixing intermediate upright 0.5 mtr in CC foundation vertically and 1.50 mtr height. All material except Intermediate upright shall be provided by the contractor.
(B) Fabrication of new fencing and erection of all (new+old) detachable welded wiremesh fencing of height 1.5 mtr and 8" above ground level with concertina ring over it, 14x14 meter around 63 MVA transformer. Work include cutting, bending, welding etc. All material including civil work material shall be provided by the contractor.
(C) Toe wall brick work 6'' height with help of cement and dust of ratio 1:3 between ground and lower runner of welded wiremesh fencing all over of size 14x14 meter. Work also include plaster with help of cement and fine sand ratio 1:4.
(D) Brush painting of new wiremesh fencing with one coat of red oxide primer and two coat of bush green synthetic enamel paint of first quality after cleaning of rust, dust etc. All the material, labour and T&P shall be provided by the contractor at his own cost.
Erection of dismantled pale fencing back to its original place after completion of work. Work include cutting, welding and painting if required.
Per day basis holding charges of trailer carrying Nitrogen filled 63 MVA T/F between 132 KV S/S Sarsol (Aligarh) and 132 KV S/S Odpura (Hathras) during carriage in case of issues such as lockdown, railways and other extrinsic or unforeseen reasons.
Katyani Construction Co.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .