Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -3.25% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹735.03 (0.26%)Admitted-Finance | -3.00% | ₹2.9 L+₹735.03 (0.26%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹12,495.38 (4.39%)Admitted-Finance | +1.00% | ₹3.0 L+₹12,495.38 (4.39%) | L3 | Admitted-Finance |
| 4 | L4₹3.1 L+₹24,255.73 (8.53%)Admitted-Finance | +5.00% | ₹3.1 L+₹24,255.73 (8.53%) | L4 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
3 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Waiting Shed at Shamshan Ghat Pathwal (Bhawani Talai) Ward No. 5 Pathwal Hiranagar
2026_RDPR_316920_4
e-NIT No.128/REW/K of 2026-27 Dated 20/07/2026
Open Tender
Civil Works
Percentage
90 days
Hiranagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,880
9 Sept 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 5 | Cum | 479.3 | ₹2,396.5 |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 2 | Cum | 4,826.5 | ₹9,653 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 3 | Cum | 5,733.6 | ₹17,200.8 |
| 4 | Supply and dumping of stones in horizontal | 1.2 | Cum | 937.9 | ₹1,125.48 |
| 5 | Half brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: 1cement : 4 Coarse sand mortar. Inclding extra for Super structure | 15 | sqm | 981.5 | ₹14,722.5 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works above plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7 | Cum | 7,788.4 | ₹54,518.8 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level . | 900 | kg | 123.2 | ₹1,10,880 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 7 | sqm | 286.35 | ₹2,004.45 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining wall | 28 | sqm | 628.95 | ₹17,610.6 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :Suspended floors | 23 | sqm | 718.2 | ₹16,518.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_1036212.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .