| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC | ₹6.3 Cr | L1 | Accepted-AOC In Below- ADMITTED DUE TO L1 |
| 2 | L2₹6.4 Cr+₹17.1 L (2.73%)Rejected-Finance DEHRADUN | UTTARAKHAND | 248001 | ₹6.4 Cr+₹17.1 L (2.73%) | L2 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 3 | L3₹6.4 Cr+₹17.2 L (2.74%)Rejected-Finance GRAM AND POST MAJHARA THANA WAZIRGANJ DISTRICT GONDA UTTAR PRADESH | MAJHARA | GONDA | UTTAR PRADESH | ₹6.4 Cr+₹17.2 L (2.74%) | L3 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 4 | L4₹6.7 Cr+₹48.1 L (7.69%)Rejected-Finance | ₹6.7 Cr+₹48.1 L (7.69%) | L4 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 5 | L5₹6.9 Cr+₹63.3 L (10.1%)Rejected-Finance N A | NA | NA | 121004 | ₹6.9 Cr+₹63.3 L (10.1%) | L5 | Rejected-Finance REJECTED BEING HIGHER RATE |
Tender Value
₹7.8 Cr
EMD Value
₹15.6 L
Closing Date
16 May 2023, 2:00 pmClosed
Office Of the S.E.,STP/KHERI CIRCLE,PWD,SITAPUR
Office Of the S.E.,STP/KHERI CIRCLE,PWD,SITAPUR
Widening and Strengthing of Pisawan-Bargaon Road
2023_CEUCZ_797025_1
1664/352C/ETENDER/STP-KHERI/23 Dt.03-04-2023
Open Tender
Civil Works - Roads
Item Rate
270 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹15.6 L
Yes
Office Of the S.E.,STP/KHERI CIRCLE,PWD,SITAPUR
5 Jul 2023
13 Apr 2023
16 May 2023
13 Apr 2023
16 May 2023
13 Apr 2023
17 Apr 2023
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (RAP with 3.5% emulsion & 1% cement)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-II)
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Grade-II)
Construction of U Shaped drain on either side of road in built up Area
Dismentling of Existing structure such as Brick work or stone work in lime or cement mortor and including stacking materials asdirected by Engineer in charge with a distance of 60 meters .
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and etc. as per Technical Specification. 600mm dia
900 mm dia
1000 mm dia
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
M/S KESHRAM CONTRACTOR
PAWAN KUMAR SINGH
M/S SOBTI INFRATECH LIMITED
M/S JAIN BROTHERS
A B ASSOCIATES
M/S AJAY PRAKASH ASSOCIATES
M/s Pradeep Pathak Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .