| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹9.2 L+₹10,348.60 (1.14%)Accepted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | Premier Engineering Company L2 | RP Electricals L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site | 2 | Jobs | 25,000 ₹29,500 | 23,000 ₹27,140 Lowest |
| 1.02 | Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard | 500 | kVAr | 2,25,000 ₹2,65,500 | 2,24,000 ₹2,64,320 Lowest |
| 1.03 | Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank. | 500 | kVAr | 75,000 ₹88,500 | 74,000 ₹87,320 Lowest |
| 1.04 | Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard | 2 | Nos | 47,000 ₹55,460 | 46,800 ₹55,224 Lowest |
| 1.05 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies. | 2 | Jobs | 17,000 ₹20,060 Lowest | 17,000 ₹20,060 Lowest |
| 1.06 | Replacement of defective capacitor duty contactors suitable for 50 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 4 | Nos | 49,600 ₹58,528 Lowest | 49,600 ₹58,528 Lowest |
| 1.07 | Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 4 | Nos | 17,500 ₹20,650 | 17,480 ₹20,626.4 Lowest |
| 1.08 | Replacement of defective capacitor duty contactors suitable for 10 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 2 | Nos | 4,600 ₹5,428 Lowest | 4,600 ₹5,428 Lowest |
| 1.09 | Replacement of a defective 1000A, 3-Pole, 50kA MCCB in the LT Panel, serving as the incomer connection between the LT Panel and the APFC Panel. Make - Standard/L&T | 1 | No | 1,23,280 ₹1,45,470.4 | 1,23,000 ₹1,45,140 Lowest |
| 1.10 | Replacement of defective Spreader Link for triple pole MCCB of 1000A 50 KA capacity. - make Standard/L&T | 12 | Nos | 15,000 ₹17,700 Lowest | 15,180 ₹17,912.4 |
Tender Value
Refer Docs
EMD Value
₹18,600
Closing Date
13 Oct 2025, 2:30 pmClosed
EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Renovation Repair of Standard make APFC Panel of 400 KVAR each installed at BPS Bawana inside Bawana WTP
2025_DJB_279286_7
NITNo.6
Open Tender
Miscellaneous Works
Works
30 days
HAIDERPUR WATER WORKS DELHI 110085
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board Delhi
₹18,600
31 Oct 2025
4 Oct 2025
13 Oct 2025
4 Oct 2025
13 Oct 2025
4 Oct 2025
Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site
Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard
Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard
Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies.
Replacement of defective capacitor duty contactors suitable for 50 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective capacitor duty contactors suitable for 10 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of a defective 1000A, 3-Pole, 50kA MCCB in the LT Panel, serving as the incomer connection between the LT Panel and the APFC Panel. Make - Standard/L&T
Replacement of defective Spreader Link for triple pole MCCB of 1000A 50 KA capacity. - make Standard/L&T
Supply of 125 A TP MCCB 25 kA to replace blown out fuse and fuse base as MCCB give better protection and prevent single phasing of capacitor units in stages as per requirement of site -make Standard/L&T
Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make -Standard
Power wiring with 16 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site.
Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure / structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site
Servicing of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonising of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site
Testing & Commissioning of complete APFC Panel installation including following: 01. Meggering of complete capacitor installation using 500V megger 02. Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. 03. Checking function and efficiency of various components of APFC panel 01. Meggering of complete capacitor installation using 500V megger
Premier Engineering Company (BID ID -1629457)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .