| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | ₹10.8 L | L1 | Accepted-AOC L1 Quoted Less than tender value |
| 2 | L2₹11.1 LRejected-AOC | ₹11.1 L | L2 | Rejected-AOC L2 Quoted More than tender value |
| 3 | L3₹11.5 LRejected-AOC | ₹11.5 L | L3 | Rejected-AOC L3 Quoted More than tender value |
| Sl No | Description | Qty | Unit | Velu Raghavan L3 | SP SARATHY L2 | BEEMJI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Name of the Work:- Construction of Drama Stage at Sathupalayam Panchayat | ||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 16.44 | cum | 268.42 ₹4,412.82 | 258.5 ₹4,249.74 | 240 ₹3,945.60 |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. | 5.44 | cum | 5,412.55 ₹29,444.27 | 5,212.56 ₹28,356.33 | 4,500 ₹24,480 |
| 4.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 with 25mm thick (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 49.88 | Sqm | 159.84 ₹7,972.82 | 153.94 ₹7,678.53 | 4,000 ₹2.0 L |
| 5.00 | Premeasurements fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 3.09 | cum | 93,512.66 ₹2.9 L | 90,057.39 ₹2.8 L | 4,500 ₹13,905 |
| 6.00 | RCC 1: 1.5:3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 24.58 | cum | 9,353.38 ₹2.3 L | 9,007.78 ₹2.2 L | 4,000 ₹98,320 |
| 7.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 37.85 | Sqm | 557.14 ₹21,087.75 | 536.55 ₹20,308.42 | 300 ₹11,355 |
| 8.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 149.29 | Sqm | 1,114.27 ₹1.7 L | 1,073.1 ₹1.6 L | 1,350 ₹2.0 L |
| 9.00 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete. | 15.34 | cum | 6,290.62 ₹96,498.11 | 6,058.18 ₹92,932.48 | 1,390 ₹21,322.60 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 77.7 | cum | 314.29 ₹24,420.33 | 302.67 ₹23,517.46 | 1,250 ₹97,125 |
Tender Value
Refer Docs
EMD Value
₹22,900
Closing Date
11 Feb 2026, 3:00 pmClosed
The Block Development Officer Kaniyambadi
The Block Development Officer Kaniyambadi
Vellore District Construction of Drama Stage at Sathupalayam Panchayat at Kaniyambadi Block MLACDS 2025-2026 Package - 01
2026_RDTN_651563_1
A2/1477/2024
Open Tender
Civil Works
180 days
The Block Development Office Kaniyambadi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,900
Yes
6 Mar 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
Name of the Work:- Construction of Drama Stage at Sathupalayam Panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 with 25mm thick (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Premeasurements fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1.5:3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cm 1:5 mix to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4 mix to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Provision For Nameboard Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_781333.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_781333.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid