Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.5 L
EMD Value
₹4,911
Closing Date
25 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
DVC NEW COLONY, DURGAPUR-713202, PASCHIM BARDHAMAN
Repairing of 02 nos. Dy gate at dy -A ch- 0.00 (ch 770 of LBMC) at Rondia under DHW Division, Durgapur during the year 2026-27
2026_IWD_5082774_1
WBIW/EE/BUE004/ e-NIT-10/2026-27
Open Tender
MECHANICAL
Percentage
120 days
BURDWAN
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,911
Yes
3 Nov 2026
3 Nov 2026
26 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 143 | Nos | 7.15 | ₹1,022.45 |
| 2 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 143 | Each Bag | 3.58 | ₹511.94 |
| 3 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 143 | Each Bag | 8.34 | ₹1,192.62 |
| 4 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. | 143 | Each Bag | 7.15 | ₹1,022.45 |
| 5 | Bailing out water by pump including all leads and lifts and including making all arrangement for disposal, where continous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically of ascertained as per direction of Engineer-in-charge. | 15 | Hp.-Hrs | 27.41 | ₹411.15 |
| 6 | Surface cleaning of metal surfaces by chemical cleaners and then by hand with emary paper, wire brush and power tool cleaners and removing dust and preparation of surface including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts. | 38.02 | Sq.m | 77.04 | ₹2,929.06 |
| 7 | Painting of Gates of Distributory/Branch/Minor canal/ Pump Coloum pipe/Pump Discharge Pipe & other similar components on prepared surfaces with one coats of zinc phosphate primer (airless spray preferred) 50microns/coat and one coal tar epoxy, 150 microns/coat including cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. | 38.02 | Sq.m | 203.42 | ₹7,734.03 |
| 8 | Taking out old existing unservicable damaged gate shutter of canal/river completely after disengaging from hoisting system completely for installation of new gate shutter. The work includes cutting of gates into suitable pieces by gas cutting, removing the same by mechanical means or suitable crane, stacking all the pieces at the suitable place or as directed by the Engineer in charge upto a lead of 1000 m. The cost includes cost of man power employed for dismantling and cost of consumables like oxygen, accetylene gas, welding rod, hire charges of machineries, like chain pulley block, gas set, grinding machine, welding set, tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading. The cost of complete dismantling of hoisting system & cost of old unservisable materials handed over to departmental godown including loading & unloading will be provided extra. a) Gate shuteer size upto 4.00 sq.m | 848 | Kg | 7.08 | ₹6,003.84 |
| 9 | Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Distributories /BranchCanal/Minor Canal/Channel as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizantal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction of Engineer in charge. The Cost includes cost of Materials, Machinaries , Manpower, Cutting,aligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification.
(without painting). | 1,060.41 | Kg | 156.48 | ₹1,65,932.96 |
| 10 | Cost of transportation for shifting the scrap materials fro site to durgapur Division officew including loading and unloading at both end etc to complete the job at site as per direction of E.I.C | 80 | KM | 14.3 | ₹1,144 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_5198208.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .