Loading…
Loading…
Tender Value
₹13.5 L
EMD Value
₹1.4 L
Closing Date
16 Jun 2026, 6:00 pm
Executive Officer
NPP MAU
WARD NO 45 RAGHUNATHPURA ME HAJI RIZWAN KE MAKAN SE DR. ANISURRAHMAN KE MAKAN TK V SALAUDDIN, ISHTEYAQUE AHMAD KE MAKAN SE ALAM KE MAKAN HOTE HUE FIROZ KE MAKAN TK NALI, PATIYA V C.C ROAD NIRMAN KARYA.
2026_DOLBU_1152942_1
71-58
Open Tender
Civil Works
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Executive Officer
₹1.4 L
26 May 2026
26 May 2026
17 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials and including grass cutting and carrage of matrials by Head load | 1 | job | 5,000 | ₹5,000 |
| 2 | Dismantiling of Brick work including St.acking of materials as directed by the Engineer-in-Charge with the dist.ance of
60.00m. Work SI No. 692 | 25.84 | Cum | 435 | ₹11,240.4 |
| 3 | E/W filling in embankment with cartage soil up to 8.00 km distances etc com. | 280.61 | Cum | 301 | ₹84,463.61 |
| 4 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T /P with all com. Work SI No. 251 | 93.6 | Cum | 115 | ₹10,764 |
| 5 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T /P with all com.
Work SI No. 273 | 15.6 | Cum | 3,250 | ₹50,700 |
| 6 | M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T /P with all com. Work SI No.305
(Deduction of old Bricks Rs.24605.00 ) | 38.25 | Cum | 4,980 | ₹1,90,480.02 |
| 7 | 12mm thick Plaster work in 1:3 in cement and fine sand mortar including labour and matrials, T /P with all com. Work SI No.583
(Deduction of old Brick Bats Rs. 9688.00) | 124.24 | Sqm | 189 | ₹23,481.93 |
| 8 | RC.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T /P with all com. Work SI No.285 | 0.88 | Cum | 9,430 | ₹8,298.4 |
| 9 | MS work in RC.C. work including labour and matrials , T /P with all com. Work SI No.504 | 0.69 | Qtl | 5,650 | ₹3,898.5 |
| 10 | Construction of Granular sub base (GSB) by providing coarse graded . material spreading in uniform layers with . motor grader on prepared surface, m1xmg by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401. | 38.11 | Cum | 3,492.6 | ₹1,33,102.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.75 MB
tech71.pdf
Tender Documents • 3.22 MB
BOQ_2159741.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid