Loading…
Loading…
Tender ID
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
27 Feb 2026, 11:00 amClosed
Senior Executive Engineer
Senior Executive Engineer, O/o Electrical Division HPSEBL Barsar
Tender for prov. SOP to Summit Digitel Infrastructure by prov. aug 63 to 100 KVA, 11/0.4 KV S/Stn Tella a/w aug. of LT and 3-Ph LT line on Partial turnkey basis under ESD HPSEBL Bhoranj. (ED Barsar) (T.S.No. 83/2025-26, WBS No. (D-25-1940).
2026_HPSEB_129022_1
HPSEBL/EDBSR/E(DS)/2025-26/34
Open Tender
Electrical Works
Turn-key
60 days
BHORANJ
Please refer tender documents
4 documents required · 4 mandatory
₹590
₹4,900
21 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
100, KVA,11/0.4KV Distribution Transformer conforming to ISI & BEE Specifications.
LT Distribution Panel Box suitable for 100KVA, 11/0.4KV (Outdoor type) Sub-Station transformer comprising of 01No. 3Pole MCCB, 160 Amps, 35KA,4P ICS = 100% ICU, KIT.KAT 200Amps Capacity equipped with Phase indicator lamps, 3phase Volt & current measuring equipment, Panel Box is duly painted powder coated paint complete in all respect as per HPSEBL/REC specifications comprises of following items (ACB & MCCB of make Schneider/L&T/ABB).
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
Aluminimum Thimble 185mm2
Copper Thimble 300mm2
LT Cable(XLPE Cable) (3.5 Core) 185mm²
Energy Meter (3-Phase, 4-Wire) DLMS compliant 200/5Amps , Accuracy Class 0.5s, LT CT Type for 100 KVA
Surge Arrester, 9 kV Station Class (Porcelain Type)
Sub-Station Pipe Earthing Set
GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type
3-ph LT LINE : AAAC 7/3.15mm (55mm²) conductor {Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage} .
9Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-32.
RCC Muff 2000mm Long with concrete filling material
Shackle Insulator (16 kN)
D-Iron (U- Clamps)made of MS Flat 50x6mm.
Earh Knob
LT Stay Set Complete i/c Guy Assembly and Helically fittings)
Stay wire 7/3.15 mm (6.00 kg. per stay set)
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m}
Prov. Earthing Set complete
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
Half Clamp made of MS Flat 50x6mm
Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
Red Oxide
Aluminium Paint
ERECTION OF DTR:-Dismentalling of existing 63 KVA transformer including dismentalling of LT Distribution Panel/ Box, Energy meter and LT Cable and return it back to concerned section store.
Erection of 100 KVA transformer including Erection of LT Distribution panel/ Box,Energy meter, Jumper, LT Cable, GO AB Switch and making necessary of connections using thimbles of appropriate size, with nut & bolts priming and painting etc complet in all respect as per latest standard practices/ Specification of REC/HPSEBL complet in all respect complete in all respect
Loading and Unloading of 63 KVA & 100 KVA transformers along with allied material.
ERECTION OF LT LINE :Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Laying of Conductor, Stringing, Sagging of AAAC, 55mm² ,7/3.15mm² and binding with Insulators (3 wires) and fixing of jumper.
Erection of LT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection complete in all respect.
Erection Charges of fixing of Jumpers of LT line as per latest standard practices /specification of REC / HPSEBL (Per Set).
Local Transportation Charges for the carriage material by road & through manual carriage to the site of work for 1Nos of each 63KVA & 100KVA,11/0.4KV Sub-Stations a/w associated 3-ph LT line . (Complete Job)
Testing fees & Commissioning Charges etc. for 1No. 100KVA,11/0.4KV Sub-Station a/w 3-ph LT line . (Complete Job).(as per Schedule of General & Service Charges & HP Govt. Notification)
Labour Cess (@ 1% of the total amount of the supply, erection, testing & commissioning of 1Nos., 100KVA,11/0.4KV Sub-Station a/w associated 3-ph LT lineetc. (for complete Job).
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
TenderdocumentNIT34.rar
Tender Documents • 3.98 MB
BOQ_190751.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .