| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-Finance | ₹7.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.1 L+₹19,951.78 (2.51%)Rejected-Finance 68 SREERAMPUR GARIA KOLKATA 700084 | KOLKATA | KOLKATA | WEST BENGAL | 700084 | ₹8.1 L+₹19,951.78 (2.51%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.3 L+₹31,557.20 (3.97%)Rejected-Finance 63X TOLLYGUNGE ROAD KOLKATA WEST BENGAL | KOLKATA | WEST BENGAL | 700033 | ₹8.3 L+₹31,557.20 (3.97%) | L3 | Rejected-Finance L3 |
Tender Value
₹7.9 L
EMD Value
₹15,900
Closing Date
23 Mar 2026, 12:00 pmClosed
THE D.G. (ROADS)
OFFICE OF THE D.G. (ROADS) ROADS DEPARTMENT KOLKATA MUNICIPAL CORPORATION 5/1 , CHOWRINGHEE PLACE KOLKATA-700 013 WEST BENGAL
REPAIRING AND WIDENING INFRONT OF THE PRE. NO 56 SOUTH TANGRA ROAD IN WD NO-58, BR-VII
2026_KMC_1014505_1
KMC/ROADS/2025-2026/820
Open Tender
CIVIL WORKS
Percentage
30 days
SOUTH TANGRA ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,900
14 Jul 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works)
(ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) , Ref - PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237 | 1 | CU.M | - | - |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (a) For Fine Sand , Ref - PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3 | - | CU.M | 1 | - |
| 3 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) , Ref - PWD (Rds & Brdgs)-2018, It. No. 4.09 Page No.247 & page-222 sl. No- 2 & 5 (g) | - | CUM | - | - |
| 4 | Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting. guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). , Ref - Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work) , page-249(item- 4.12) & 212(table3.3-1) and 4th Addenda &
Corrigenda | - | CU.M | - | - |
| 5 | Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(i) 150 mm , Ref - PWD SANITARY & PLUMBING WORKS_WEF 01.11.2017,PAGE-66 & 67 ITEM-15(iIi) | - | MTR. | - | - |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. , Ref - PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1 | - | SQ.M | - | - |
| 7 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (b) 1:4:8 proportion , Ref - PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10 | - | CU.M | - | - |
| 8 | Constructing catch pit to a depth of 1.0m (Insid(e) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (150mm dia) with topping RCPC gully grid (5MT load bearing capacity) constructing invert with brick -on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 100mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of catch pit, 600mm X 525mm , Ref - UDMA.S&D SCHEDULE_WEF_05-10-2018 | - | EA | - | - |
| 9 | PRIME COAT :Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i)For WBM / WMM Surface:®(with primer @ 0.70-1.0 kg/sqm) , Ref - Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.01) | 0.4 | SQ.M | - | - |
| 10 | Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular Surfaces treated with primer (Using Bitumen Emulsion at the rate of 0.25 to 0.30 kg per sqm.) , Ref - Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02) | - | SQ.M | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
794892TENDERFORMKMCROADS202520268201stCall.pdf
Tender Documents • 0.42 MB
BOQ_2491968.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .