Public Works Department
Construction of approach road for Sunksal-Dongri bridge and Raising up of Dongri-Halavalli MDR Km 10.50 in Ankola Taluk (U.K)
PWD/2024-25/RD/WORK_INDENT21005
PWD/2024-25/RD/WORK_INDENT21005
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Karwara
₹850
₹68,000
14 May 2025
14 May 2025
21 May 2025
Construction of approach road for Sunksal -Dongri bridge and Raising up of Dongri-Halavalli MDR Km 10.50 in Ankola Taluk (U.K)
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Tack coat on Bituminous surface - Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with m...
Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading prem...
Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading pre...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row - Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culv...
Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.2...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .