Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹7,996.39 (5.26%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.7 L+₹15,772.88 (10.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.8 L+₹29,986.47 (19.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.0 L+₹46,646.95 (30.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
28 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER REW KISHTWAR
HALL NO. 4 O/O EXECUTIVE ENGINEER REW KISHTWAR
Refer BoQ
2026_RDPR_325508_3
e-NIT No 120 of REW KISHTWAR 2026-27 Dated. 19.09.2026
Open Tender
Civil Works
Percentage
Kishtwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,000
7 Oct 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds: | - | CUM | 479.3 | - |
| 2 | Random Rubble masonry with hard stone in foundation and plinth including levellingn1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) | - | cum | 5,402.9 | - |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth: | - | cum | 2,793.8 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 7,104.35 | - |
| 5 | Steel reinforcement including cutting fixing hoisting all complete job | - | kg | 115.35 | - |
| 6 | Centering and shuttering for suspended floors | - | sqm | 718.2 | - |
| 7 | Providing and fixing pvc rain water pipe 100mm dia | - | m | 225 | - |
| 8 | Carriage of stone | - | cum | 595.88 | - |
| 9 | Carriage of sand and aggregate | - | cum | 654.3 | - |
| 10 | CIB | 4 | nos | 1,000 | ₹4,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1100267.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .