Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
Closing Date
4 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX.Engineer irrrigation ompora budgam
EX.Engineer irrrigation ompora budgam
Construction of Retaining cum linned channel on Barrigund khul M/O Kralcheck Kul at Barrigund. Amount of work Rs. 3.87 lacs (Including deptt supply) (FRESH)
2021_IFC_150333_6
ENIT 33 OF 11/2021
Open Tender
Civil Works
Item Wise
15 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹400
Yes
ExecutiveEngg ID ompora
Yes
6 Dec 2021
27 Nov 2021
6 Dec 2021
27 Nov 2021
4 Dec 2021
27 Nov 2021
270 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil :
Dumping stone excI cost of stone in Horizontal on level.
Supply of stone boulders
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: a)1:4:8 (1 cement : 4 coarse sand: 8 graded stone agg.40mm nominal size ) .
b)1:3:6 (1 cement : 3 coarse sand: 6 graded stone agg.20mm nominal size ) .
Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for: a)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc..
12mm Cement plaster of mix: a) 1 : 6 ( 1 cement : 6 fine sand)
Filling avilable excavated earth (ExI rock in trenches ,plinth sides of foundation etc.in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m
Providing for PVC pipes for weeping holes.
Carriage of Materials from source upto road site of work by Mechanical transport including cost of loading unloading and stacking a)stone soling /boulder av. 10Km
b) 40mm agg from Athwajan av.25Km
c)20mm agg ---do----
d)sand from Marval av. 20Km.
e) cement/steel from division store av. 36km
Extra Carriage of Materials from road site to site of work by Mannual laboour/ponies including loading unloading and stacking av. 50mtrs. a)stone soling/boulder
b)40mm agg
c) 20 mm agg
d) sand
e) cement
f)steel
Removal of trees with trunks
BASHIR AHMAD WANI
M/S FAZIL CONSTRUCTIONS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .