Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | ₹11.7 L Quoted ₹9.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.7 LRejected-AOC | ₹11.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹11.7 LRejected-AOC | ₹11.7 L | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical GANABARAN GHAZIPUR SULTANPUR KAINALTORASK DINK RD | GHAZIPUR | UTTAR PRADESH | 232325 | - | - | Rejected-Technical experience does not meet the required standards |
| Sl No | Description | Qty | Unit | M/S RAM ASAREY PATEL L3 | ARUN SINGH L2 | M/S AWADH CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of stone pitching by Earth work , C. C work, RCC work, R.R. Stone masonary work and 20 mm deep struck cement pointing with all cost of materials, labours and T&P etc for proper completion of work as per draeing and direction of engineer-in-charge at slope of Tonse river Devra pump canal. | ||||||
| 1.01 | Earth work filling on slope | 144 | cum | 177 ₹25,488 | 177 ₹25,488 | 184 ₹26,496 |
| 1.02 | Earth work in digging | 201.18 | cum | 81 ₹16,295.58 | 80 ₹16,094.40 | 77 ₹15,490.86 |
| 1.03 | Local Sand Filling | 32.78 | cum | 1,545 ₹50,645.10 | 1,545 ₹50,645.10 | 1,262 ₹41,368.36 |
| 1.04 | C.C 1:3:6 with 20 mm to 40 mm stone grit | 12.76 | cum | 5,138 ₹65,560.88 | 5,137 ₹65,548.12 | 3,850 ₹49,126 |
| 1.05 | R.R Stone masonary in 1:4 CM | 140.62 | cum | 6,830 ₹9.6 L | 6,830 ₹9.6 L | 5,300 ₹7.5 L |
| 1.06 | C.C 1:2:4 with 10 mm to 20 mm stone grit | 1.99 | cum | 6,955 ₹13,840.45 | 6,954 ₹13,838.46 | 7,000 ₹13,930 |
| 1.07 | 20 mm deep struck cement pointing on stone lining with 1:2 CM | 21.6 | cum | 151 ₹3,261.60 | 150 ₹3,240 | 165 ₹3,564 |
| 1.08 | RCC work 1:2:4 with 10 to 20mm stone grit | 4.7 | cum | 8,367 ₹39,324.90 | 8,366 ₹39,320.20 | 7,050 ₹33,135 |
Tender Value
₹11.7 L
EMD Value
₹23,500
Closing Date
29 Apr 2026, 5:00 pmClosed
EE
EE MLCD Prayagraj
Construction of stone pitching by Earth work, C. C work, RCC work, R.R. Stone masonary work and 20 mm deep struck cement pointing with all cost of materials, labours and T and P etc for proper completion of work.
2026_UPIDM_1138800_1
01/EE/MLCD/2026-27
Open Tender
Civil Works
90 days
Dewara Pump Canal
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹23,500
22 May 2026
23 Apr 2026
30 Apr 2026
24 Apr 2026
29 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of stone pitching by Earth work , C. C work, RCC work, R.R. Stone masonary work and 20 mm deep struck cement pointing with all cost of materials, labours and T&P etc for proper completion of work as per draeing and direction of engineer-in-charge at slope of Tonse river Devra pump canal. | |||||
| 1.01 | Earth work filling on slope | - | cum | - | - |
| 1.02 | Earth work in digging | - | cum | - | - |
| 1.03 | Local Sand Filling | - | cum | - | - |
| 1.04 | C.C 1:3:6 with 20 mm to 40 mm stone grit | - | cum | - | - |
| 1.05 | R.R Stone masonary in 1:4 CM | - | cum | - | - |
| 1.06 | C.C 1:2:4 with 10 mm to 20 mm stone grit | - | cum | - | - |
| 1.07 | 20 mm deep struck cement pointing on stone lining with 1:2 CM | - | cum | - | - |
| 1.08 | RCC work 1:2:4 with 10 to 20mm stone grit | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
TENDER_DOC.pdf
Tender Documents • 1.48 MB
BOQ_2126248.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid