| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3,171Admitted-Finance | ₹3,171 | L1 | Admitted-Finance |
| 2 | L2₹3,611+₹440 (13.9%)Admitted-Finance | ₹3,611+₹440 (13.9%) | L2 | Admitted-Finance |
| 3 | L3₹3,650+₹479 (15.1%)Admitted-Finance | ₹3,650+₹479 (15.1%) | L3 | Admitted-Finance |
| 4 | L4₹3,737+₹566 (17.8%)Admitted-Finance | ₹3,737+₹566 (17.8%) | L4 | Admitted-Finance |
| 5 | L5₹5,090+₹1,919 (60.5%)Admitted-Finance | ₹5,090+₹1,919 (60.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | 62/2-A/2023 L5 | Hi Tech Electrical Works L3 | ABBAS ELECTRICAL WORKS L7 | Madina Electrical Works L2 | M/S ROHIT SHARMA L9 | C.T ELECTRICAL ENGINEER L11 | CHOUDHARY ELECTRICAL L1 | DILBAGH SINGH L6 | AQUIB TRADERS L12 | NATIONAL TRADER & SUPPLIERS L8 | GENERAL ENGINEERING WORKS L10 | M/S AL-AQSA TRADERS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00400 KVA Distribution transformers (Al/copper wound) | |||||||||||||||
| 1.01 | Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job) | 1 | set | 650 ₹650 | 126 ₹126 | 830 ₹830 | 125 ₹125 | 1,250 ₹1,250 | 1,850 ₹1,850 | 120 ₹120 Lowest | 800 ₹800 | 800 ₹800 | 850 ₹850 | 850 ₹850 | 126 ₹126 |
| 1.02 | Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any | 1 | Nos | 60 ₹60 Lowest | 96 ₹96 | 200 ₹200 | 95 ₹95 | 95 ₹95 | 200 ₹200 | 80 ₹80 | 65 ₹65 | 300 ₹300 | 220 ₹220 | 285 ₹285 | 90 ₹90 |
| 1.03 | Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc | 1 | Nos | 60 ₹60 Lowest | 96 ₹96 | 160 ₹160 | 95 ₹95 | 95 ₹95 | 200 ₹200 | 80 ₹80 | 65 ₹65 | 200 ₹200 | 170 ₹170 | 210 ₹210 | 90 ₹90 |
| 1.04 | Labour charges for painting of transformer tank (inner and outer side), radiators (complete job) | 1 | Nos | 60 ₹60 | 101 ₹101 | 95 ₹95 | 100 ₹100 | 85 ₹85 | 180 ₹180 | 90 ₹90 | 65 ₹65 | 50 ₹50 Lowest | 100 ₹100 | 50 ₹50 Lowest | 90 ₹90 |
| 1.05 | Reconditioning of LV Coil…(Copper) | 1 | Kg | 60 ₹60 Lowest | 86 ₹86 | 85 ₹85 | 85 ₹85 | 80 ₹80 | 120 ₹120 | 80 ₹80 | 65 ₹65 | 300 ₹300 | 90 ₹90 | 190 ₹190 | 90 ₹90 |
| 1.06 | Reconditioning of LV Coil…(Aluminium) | 1 | Kg | 60 ₹60 | 5 ₹5 | 5 ₹5 | 5 ₹5 | 85 ₹85 | 120 ₹120 | 4 ₹4 Lowest | 65 ₹65 | 250 ₹250 | 6 ₹6 | 5 ₹5 | 4 ₹4 Lowest |
| 1.07 | Winding of HV coil….(Copper) | 1 | Kg | 10 ₹10 | 81 ₹81 | 120 ₹120 | 80 ₹80 | 60 ₹60 | 80 ₹80 | 65 ₹65 | 5 ₹5 Lowest | 300 ₹300 | 130 ₹130 | 190 ₹190 | 85 ₹85 |
| 1.08 | Winding of LV coil….(Copper) | 1 | Kg | 10 ₹10 | 80 ₹80 | 95 ₹95 | 80 ₹80 | 60 ₹60 | 80 ₹80 | 70 ₹70 | 5 ₹5 Lowest | 300 ₹300 | 100 ₹100 | 190 ₹190 | 85 ₹85 |
| 1.09 | Winding of HV coil….(Aluminium) | 1 | Kg | 60 ₹60 | 6 ₹6 | 4 ₹4 | 5 ₹5 | 80 ₹80 | 80 ₹80 | 2 ₹2 Lowest | 70 ₹70 | 250 ₹250 | 5 ₹5 | 5 ₹5 | 3 ₹3 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 May 2026, 4:00 pmClosed
Executive Engineer Electric Division JPDCL Poonch
Executive Engineer Electric Division JPDCL Poonch
ANNUAL RATE CONTRACT FOR Annual Rate contract for Repair of Damage Transformer/ HT/LT Winding in respect of Electric Sub Division JPDCL Plant Potha/Poonch, in the Jurisdiction of Electric Division(JPDCL) Poonch for the financial year 2026-27
2026_PDD_308919_1
e-NIT No.EDP/08 of 2026 dated.28.04.2026
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Poonch
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Executive Engineer Electric Division JPDCL Poonch
₹50,000
18 Jun 2026
28 Apr 2026
20 May 2026
28 Apr 2026
18 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1400 KVA Distribution transformers (Al/copper wound) | |||||
| 1.01 | Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job) | 1 | set | - | - |
| 1.02 | Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any | 1 | Nos | - | - |
| 1.03 | Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc | 1 | Nos | - | - |
| 1.04 | Labour charges for painting of transformer tank (inner and outer side), radiators (complete job) | 1 | Nos | - | - |
| 1.05 | Reconditioning of LV Coil…(Copper) | 1 | Kg | - | - |
| 1.06 | Reconditioning of LV Coil…(Aluminium) | 1 | Kg | - | - |
| 1.07 | Winding of HV coil….(Copper) | 1 | Kg | - | - |
| 1.08 | Winding of LV coil….(Copper) | 1 | Kg | - | - |
| 1.09 | Winding of HV coil….(Aluminium) | 1 | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.15 MB
Tendernotice_2.pdf
PDF • 1.52 MB
Tendernotice_3.pdf
PDF • 0.17 MB
BOQ_1000561.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .