Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.0 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹28.3 L+₹6.4 L (29.0%)Rejected-AOC DURAM BAGH KARL PORA CHADOORA KASHMIR B O HARI SINGH HIGH STREET SRINAGAR 190019 | BUDGAM | JAMMU AND KASHMIR | 190019 | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹29.1 L+₹7.1 L (32.5%)Rejected-AOC | L-3 | Rejected-AOC L-3 | |
| 4 | L-4₹33.4 L+₹11.5 L (52.2%)Rejected-AOC 168 RAMBAGH PAYEEN SRINAGAR J K 190015 | SRINAGAR | JAMMU AND KASHMIR | 190015 | L-4 | Rejected-AOC L-4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Firm does not fulfils the tender criteria as per NIT Conditions |
| Sl No | Description | Qty | Unit | Mehraj Ud Din Rather L3 | M/S N.A. AND SONS L2 | MIRAJ KHAN & COMPANY L4 | MEHJOOR CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.32 | cum | 54,900 ₹54,900 | 65,880 ₹65,880 | 60,024 ₹60,024 | 40,260 ₹40,260 Lowest |
| 2.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.78 | cum | 32,130 ₹32,130 | 37,800 ₹37,800 | 34,020 ₹34,020 | 21,924 ₹21,924 Lowest |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 324.48 | kg | 34,070.4 ₹34,070.4 | 34,070.4 ₹34,070.4 | 38,937.6 ₹38,937.6 | 27,580.8 ₹27,580.8 Lowest |
| 4.00 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V leveCement mortar 1:4 (1 cement :4 coarse sand) | 16.2 | sqm | 40,500 ₹40,500 | 32,400 ₹32,400 Lowest | 40,500 ₹40,500 | 40,500 ₹40,500 |
| 5.00 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels Raj Nagar Plain white marble/ Udaipur green marble/ Zebra black marbleArea of slab over 0.50 sqm | 34.97 | sqm | 1,57,365 ₹1,57,365 | 1,39,880 ₹1,39,880 | 2,44,790 ₹2,44,790 | 50,706.5 ₹50,706.5 Lowest |
| 6.00 | Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar location in marble/ Granite/ stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete. | 20 | each | 16,000 ₹16,000 Lowest | 70,000 ₹70,000 | 24,000 ₹24,000 | 54,000 ₹54,000 |
| 7.00 | Providing and fixing Ist quality ceramic glazed wall tiles of size 300 x 450 or more conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing | 302.22 | sqm | 4,53,330 ₹4,53,330 | 3,32,442 ₹3,32,442 Lowest | 5,28,885 ₹5,28,885 | 4,07,997 ₹4,07,997 |
| 8.00 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately)Kiln seasoned and chemically treated hollock wood | 0.91 | cum | 54,660 ₹54,660 Lowest | 1,36,650 ₹1,36,650 | 81,990 ₹81,990 | 71,058 ₹71,058 |
| 9.00 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float glass panes, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws.Kiln seasoned and chemically treated hollock wood35 mm thick | 24.84 | sqm | 79,488 ₹79,488 | 79,488 ₹79,488 | 99,360 ₹99,360 | 28,566 ₹28,566 Lowest |
| 10.00 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws | 59.64 | sqm | 2,02,776 ₹2,02,776 | 2,08,740 ₹2,08,740 | 3,57,840 ₹3,57,840 | 74,550 ₹74,550 Lowest |
Tender Value
₹35.7 L
EMD Value
₹71,325
Closing Date
29 Sept 2025, 5:00 pmClosed
Commandant Engineer JK Zone HQR CRPFJammu
Office of the SDG CRPF JK Zone Jammu
Special repair works of T II 12 Nos F Qtrs Block no 01 to 03 each block 06 Nos Qtrs at DIG Range office SKOR
2025_CRPF_872727_3
B.V-9/2025-26-JKZ -C-CELL (SKOR RB T-I1 AND T-III)
Open Tender
Civil Works
Works
180 days
GC CRPF Humhama Campus Srinagar JK
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹71,325
22 Oct 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
29 Sept 2025
24 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .