| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.8 LAdmitted-Finance KACHEHRI AMBEDAKARNAGAR CHAUK DISTRICT GORAKHPUR | -5.25% | ₹63.8 L | L1 | Admitted-Finance |
| 2 | L2₹65.9 L+₹2.1 L (3.36%)Admitted-Finance R O TILAKHURA TO JHALALBURUA LINK ROAD | -2.07% | ₹65.9 L+₹2.1 L (3.36%) | L2 | Admitted-Finance |
| 3 | L3₹66.5 L+₹2.7 L (4.22%)Admitted-Finance ADD 446A DOCHANIA BHAWAN PURDILPUR GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | -1.25% | ₹66.5 L+₹2.7 L (4.22%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical MAHUADABAR PACHAT MISHROLIYA DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | - | Rejected-Technical Not RESPONSIVE |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical NOT RESPONSIVE |
Tender Value
₹67.3 L
EMD Value
₹5.4 L
Closing Date
14 Jul 2026, 3:00 pmClosed
CEO GIDA
O/O CEO GIDA SECTOR 7 GIDA GORAKHPUR
Work of Filling soil and construction of Boundary wall of Park no 5 Under GIDA Area Residential Sec 11
2026_UGIDA_1167056_1
1732/GIDA/2026-27 DT. 23.06.2026
Open Tender
Civil Works
Percentage
180 days
GIDA GORAKHPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
₹5.4 L
31 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boundary Wall
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 | 108.07 | Cum | 120 | ₹12,968.4 |
| 2 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. Sor No 280 | 29.86 | Cum | 5,960 | ₹1,77,965.6 |
| 3 | Providing Concrete For Rainforcment concrete M-25 in open Foundations complete Asper Drawing and Technical Specification MoRTH Clauses 12.08 E Case II | 89.24 | Cum | 10,666 | ₹9,51,833.84 |
| 4 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. only use for sail brand Tmt barMorth | 59.54 | Qtl | 7,380 | ₹4,39,405.2 |
| 5 | M 150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Sor N0 307+309+310 | 49.55 | Cum | 5,045 | ₹2,49,979.75 |
| 6 | Fabrication Supply and Fixing Of M.S Angle Mild steel or iron work in heavy sizes such as trusses; builts up gates, door, frames, record racks roof work, gates etc. wrought to required form including drilling holes, rivetting or welding where necessary, and also including supply of steel, bolts, nuts etc. & their fixing required for proper completion of the work.DSR 10.16 2023 | 5,215.4 | kg | 147.74 | ₹7,70,523.2 |
| 7 | 12mm Thick plaster with cement mortar in proportion of 1:3 cement and Corse sand of over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) Dsr 13.1 | 540.96 | Sqm | 263.76 | ₹1,42,683.61 |
| 8 | Finishing walls with' one coat. of water' proof cement paint of approved quality of previously' old 'treated surface with this paint to give an even shade including supply of all materials, labour 'and T&P etc. required for the proper completion of the work. Sor 660 | 540.96 | Sqm | 47 | ₹25,425.12 |
| 9 | Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes, fine steel/wood scrappers sand papering and knotting including cost of all materials, labour and T&P etc. required for proper completion of the work. S.I.No-1 Chapter 15 New Item Sor 1 | 718.1 | Sqm | 19 | ₹13,643.9 |
| 10 | Painting first coat over priming coat (but excluding cost of priming cost) on wood or steel and other metal surface with superior synthetic enameland finish and inclucoat after first coat on wood or steel surface Sor 2+3III | 718.1 | Sqm | 50 | ₹35,905 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
Tendernotice_2.pdf
PDF • 1.72 MB
BOQ_2188918.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .