| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.4 LAdmitted-Finance | -28.00% | ₹30.4 L | L1 | Admitted-Finance |
| 2 | L2₹31.2 LAdmitted-Finance KORBA CHHATTISGARH 495677 INDIA UDYAM CG 10 0000711 | KORBA | CHHATTISGARH | 495677 | -26.12% | ₹31.2 L | L2 | Admitted-Finance |
| 3 | L3₹31.5 LAdmitted-Finance GROUND AIRA ROAD NAWRANGABAD KHERI UTTAR PRADESH 262701 UDYAM UP 48 0008754 | KHERI | UTTAR PRADESH | 262701 | -25.52% | ₹31.5 L | L3 | Admitted-Finance |
| 4 | L4₹33.0 LAdmitted-Finance | -21.86% | ₹33.0 L | L4 | Admitted-Finance |
| 5 | L5₹34.5 LAdmitted-Finance 7 B SHASTRI NAGAR GULAB CHAND KI BAGICHI JHAVAR ESTATE THATIPUR GWALIOR MADHYA PRADESH 474011 UDYAM MP 20 0058499 23CNQPJ5067F2ZT B 23CNQPJ5067F1ZU R | GWALIOR | MADHYA PRADESH | 474011 | -18.38% | ₹34.5 L | L5 | Admitted-Finance |
Tender Value
₹42.3 L
EMD Value
₹84,550
Closing Date
16 Mar 2026, 3:30 pmClosed
AGM(Civil)
FCI RO Jaipur
Reconstruction of collapsed compound wall at FSD Sujangarh
2026_FCI_901300_1
CE/20/2025-26
Open Tender
Civil Works
90 days
FSD Sujangarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹84,550
21 Apr 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge.2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo Mechanically Treated bars of gradeFe-500D or more.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used
6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand)
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
20 mm cement plaster of mix :1:4 (1 cement : 4 coarse sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_947345.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
MTFtobeuploaded.pdf
Tender Documents • 2.23 MB
BOQ_947345.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid