Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAccepted-AOC | L1 | Accepted-AOC LOWEST
QUOTED
AMOUNT | |
| 2 | L2₹24.4 L+₹48,446.30 (2.03%)Rejected-Finance | L2 | Rejected-Finance HIGHER
QUOTED
AMOUNT | |
| 3 | L3₹26.0 L+₹2.1 L (8.60%)Rejected-Finance | L3 | Rejected-Finance HIGHER
QUOTED
AMOUNT | |
| 4 | L4₹26.8 L+₹2.9 L (11.9%)Rejected-Finance | L4 | Rejected-Finance HIGHER
QUOTED
AMOUNT | |
| 5 | L5₹31.4 L+₹7.5 L (31.5%)Rejected-Finance 70N SANCHAR NAGAR KANADIA ROAD INDORE M P | INDORE | INDORE | MADHYA PRADESH | L5 | Rejected-Finance HIGHER
QUOTED
AMOUNT |
Tender Value
₹43.9 L
EMD Value
₹54,900
Closing Date
6 Aug 2022, 5:00 pmClosed
SO MINING PATHAKHERA AREA
OFFICE OF THE STAFF OFFICER MINING GM OFFICE PATHAKHERA AREA WCL
Loading of material (as mentioned in BOQ) at surface, and transportation and unloading of the same from surface to all running underground working panels of Bagdona Seam at Tawa Mine Pathakhera Area WCL
2022_WCL_251382_1
PK3550-E-MIN-0027-2022-23
Open Tender
Miscellaneous Works
Item Rate
273 days
Tawa Mine Pathakhera Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹54,900
30 Aug 2022
26 Jul 2022
8 Aug 2022
26 Jul 2022
6 Aug 2022
27 Jul 2022
26 Jul 2022 - 30 Jul 2022
Amount
Roof bolts with nuts and bearing plates, w straps
Capsules required for bolting
Stemming Material
Stone Dust/ Cement bags
Total impact of GST for the purpose of CTC
imteyaz Ahemad
NAGENDRA SINGH KUSHWAHA
NAMAN ENTERPRISES
SARTHAK CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .