Tender Value
₹7.6 Cr
EMD Value
₹7.6 L
Closing Date
20 Jun 2026, 3:30 pm
Chief Engineer, HMDA
7th floor, East Wing, Swarnajayanthi Commerical Complex, Ameerpet-500038
Laying of CC Roads in the Mandals of Mahabubnagar District under Jadcherla Assembly Constituency
706274
HMDA/DEV/CE/07/01/2026-27, Date: 04.06.2026
OPEN
Civil Engineering Works
MAHABUBNAGAR
1 document required · 1 mandatory
₹11,800
₹7.6 L
6 Jun 2026
6 Jun 2026
6 Jun 2026
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000m including Overheads and Contractors Profit as per Technical Specification Clause 302.3 MORD / 301 MORTH and as directed by the Engineer-in-Charge.
Excavation for roadway in hard rock (Blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections including Overheads and Contractors Profit as per Technical Specification Clause 302.3.5 MORD/ 301 MORTH and as directed by the Engineer-in-Charge.
Forming embankment with borrowed useful earth from outside road boundary by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, Overheads and Contractors Profit but excluding seigniorage charges., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m and as directed by the Engineer-in-Charge.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH including Overheads and Contractors Profit and as directed by the Engineer-in-Charge.
Providing and Laying of Plain Cement Concrete (PCC) of Grade M10 - Nominal Mix using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges for mixing , laying and finishing top surface to the required level curing etc., complete for finished item of work including Overheads and Contractors profit and as directed by the Engineer-in-charge.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, Plain Cement Concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and Technical Specification 602 MORTH.
Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.70-0.80 atmospheres as per the standard procedure floting with powerfloater, mechanical trawelling, finishing with sound edges and camers including hire and operational charges of machinery, etc,including,Loading , Unloading, Contarctor's profit and overhead charges but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.
Groove Cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC Pavement 100mm to 200mm thick, complete for finished item of work and as directed by the Engineer-in-charge.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery as directed by the Engineer-in-charge.
Carting of surplus excavated earth/rock/dismantled material with a Lead of 5 km from the site including loading, unloading charges, cost & conveyance, labour charges, complete for finished item of work and as directed by Engineer-in-charge.
Excavation for underground drainage lines in soil with hydraulic excavator of 0.9 cum bucket capacity in narrow trenches including cutting and loading, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, setting out, construction of shoring strutting and bracing, removal of stumps and other deleterious material and disposal with all lifts and lead upto 1000 m including dressing of sides and bottom backfilling as per Technical Specification Clause 302.3 MORD / 301 MORTH for Pipe Line Trenches, including provision for narrow trenches in restricted areas, including contractor's profit and overhead charges but excluding Seigniorage Charges, compete for finished items of work and as directed by Engineer-in charge.
Excavation for Under ground drainage lines in hard rock in narrow trenches with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections,setting out, construction of shoring, strutting and bracing, removal of stumps and other deleterious material, loading and disposal of cut rock with all lifts and leads upto 1000 m including dressing of sides and bottom, backfilling as per Technical Specification Clause 302.3.5 MORD / 301 MORTH for Pipe Line Trenchs including provision for narrow trenches in restricted areas and contractor's profit and overhead charges but excluding Seigniorage Charges,complete for finished items of work and as directed by Engineer-in charge
Supplying and filling of Robo sand in trenches, sides of the foundations and basement with initial lead in layers not exceeding 15 cm thick consolidatiing each depposited layer by watering and rampping including cost and conveyance of water to work site and all operational incidental, labour charges hire charges and T & P, contractor's profit and overhead charges complete for finished item and as directed by Engineer-in charge (APSS 309 &310)
Refilling with usefull available excavated earth / soils in trenches ,sides of foundations & basement and the pipeline trenches after laid, jointed, executed, tested with intial lead in layors not exceeding 15 cm thick , consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost and conveyonce of water to work site and all operational ,incidental,labour charges,hire charges of T&P, contractor's profit and overhead charges Complete for finished item of work and as directed by the Engineer-in-charge (BLD-CSTN 2-8).
Manufacture, Supply and Delivery of 300mm internal dia R.C.C. NP3 Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes with M35 grade concrete conforming to B.I.S. 458/2003 at exfactory (rate per meter of effective length) in standard lengths using Sulphate Resistant Cement confirming to IS 12330/1998 including laying and jointing, lowering in the readymade trenches, cost of rubber rings, conveyance to site inclding cost of all materials unloading, hoisting, laying true to aligmnet and gradient by using cranes jointing with rubber rings all other incidental and operational charges and testing, contractor's profit and overhead charges but excluding Seignorage Chrages etc., complete for finished item of work and as directed by the Engineer-in-charge.
Manufacture, Supply and Delivery of 450mm internal dia R.C.C. NP3 Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes with M35 grade concrete conforming to B.I.S. 458/2003 at exfactory (rate per meter of effective length) in standard lengths using Sulphate Resistant Cement confirming to IS 12330/1998 including laying and jointing, lowering in the readymade trenches, cost of rubber rings, conveyance to site inclding cost of all materials unloading, hoisting, laying true to aligmnet and gradient by using cranes jointing with rubber rings all other incidental and operational charges and testing, contractor's profit and overhead charges but excluding Seignorage Chrages etc., complete for finished item of work and as directed by the Engineer-in-charge.
Constructon of 0.90 M Circular Sewer Man hole of 0.90 mts x 0.56m of 1.0 M depths with Fly ash cement solid blocks with compressive strength of 50 kg/sq.cm - IS:12894-1990 - CLASS - 5, 225 x 100 x 60 mm in cm 1:6 prop and corbelling too including CC bed ( 1: 4 : 8 ) prop using 40 mm gauge HG Metal 0.15 mt thick and CC (1:2:4) Prop benching / chanelling, internal plastering with 20 mm thick cm 1:4 and External Plastering with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days, contractors profit and overhead charges but excluding seignarage charges as per specification etc., for 300mm dia pipe. complete for finished item of work and as directed by the Engineer-in-charge.
Constructon of 0.90 M Circular Sewer Man hole of 0.90 mts x 0.56m of 1.0 M depths with Fly ash cement solid blocks with compressive strength of 50 kg/sq.cm - IS:12894-1990 - CLASS - 5, 225 x 100 x 60 mm in cm 1:6 prop and corbelling too including CC bed ( 1: 4 : 8 ) prop using 40 mm gauge HG Metal 0.15 mt thick and CC (1:2:4) Prop benching / chanelling, internal plastering with 20 mm thick cm 1:4 and External Plastering with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days, contractors profit and overhead charges but excluding seignarage charges as per specification etc., for 450mm dia pipe. complete for finished item of work and as directed by the Engineer-in-charge.
Construction of additional man hole 0.10 m depth, construction of 0.90 m circular sewer manhole of 1 to 1.65 m depth with Fly ash cement solid blocks with compressive strength of 50 kg/sq.cm - IS:12894-1990 - CLASS - 5,225 x 100 x 60 mm in CM (1:6) prop as per specification, etc. complete. Internal plastering with 20 mm thick in CM (1:4) and external plastering with 12 mm thick in CM(1:4) with fine rendering including cost and fixing of CI steps and fixing FC/CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site, complete and curing for 21 days complete, Contractor's profit and overhead charges but excluding seigniorage charges as per specification etc., complete for finished item of work and as directed by the Engineer-in-charge
Constructon of 1.20 M Circular Sewer Man hole of 1.20 mts x 0.55 m of 1.65 M depths with Fly ash bricks in cm 1:6 prop and corbelling too including CC bed ( 1:4:8 ) prop using 40 mm gauge HG Metal 0.10 mt thick and CC (1:2:4) Prop benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days including all taxes but excluding seignarage charges as per specification for 300mm dia pipe and as directed by the Engineer-in-charge.
Constructon of 1.20 M Circular Sewer Man hole of 1.20 mts x 0.55 m of 1.65 M depths with Fly ash bricks in cm 1:6 prop and corbelling too including CC bed ( 1:4:8 ) prop using 40 mm gauge HG Metal 0.10 mt thick and CC (1:2:4) Prop benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days including all taxes but excluding seignarage charges as per specification for 450mm dia pipe and as directed by the Engineer-in-charge.
Construction of Additional manhole 0.10 M depth constructon of 1.2 circular sewer man hole of 1.65m to 2.3m depth with Fly ash cement solid blocks with compressive strength of 50 kg/sq.cm - IS:12894-1990 - CLASS - 5,225 x 100 x 60 mm in CM(1:6) Prop as per specification etc complete. Internal plastering with 20 mm thick CM (1:4) and External plastering with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete, Contractor's profit and overhead charges, but excluding seignarage charges as per specification etc.complete for finished item of work and as directed by the Engineer-in-charge.
Constructon of 1.50 M Circular Sewer Man hole of 1.20 mts x 0.55 m of 2.3 M depths with Fly ash bricks in cm 1:6 prop and corbelling too including cc bed ( 1:4:8 ) prop using 40 mm gauge HG Metal 0.10 mt thick and CC (1:2:4) Prop benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all taxes seignarage charges as per specification for 300mm dia pipe and as directed by the Engineer-in-charge..
Constructon of 1.50 M Circular Sewer Man hole of 1.20 mts x 0.55 m of 2.3 M depths with Fly ash bricks in cm 1:6 prop and corbelling too including cc bed ( 1:4:8 ) prop using 40 mm gauge HG Metal 0.10 mt thick and CC (1:2:4) Prop benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all taxes seignarage charges as per specification for 450mm dia pipe and as directed by the Engineer-in-charge..
Additional manhole 0.10 M depth constructon of 1.5 circular sewer man hole of 2.3 mts - 3.0mts depth with Fly ash bricks in CM(1:6) Prop as per specification etc complete. benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all taxes seignarage charges as per specification etc complete.
Supply & Delivery of Manhole covers with ISI marking anywhere in T.G, F.O.R destination including loading, un-loading at site, Contractor's profit and overhead charges etc as applicable ISI Mark, complete for finished item of work and as directed by the Engineer-in-charge. (H.D.-35 with 560mm dia clear opening)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender document for CC roads in Jadcherla.docx
TENDER_DOCUMENT • 0.21 MB
BOQ for CC Roads Jadcherla.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid