Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance ALIGANJ LUCKNOW LUCKNOW UTTAR PRADESH 226024 | LUCKNOW | UTTAR PRADESH | 226024 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 126 31 B N ROAD LUCKNOW UTTAR PRADESH 226001 INDIA | LUCKNOW | UTTAR PRADESH | 226001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
4 Feb 2021, 4:00 pmClosed
Superintending Engineer Estt HR
SLDC BHAWAN GOMTI NAGAR LUCKNOW
COMPREHENSIVE ANNUAL MAINTENANCE OF 10 KVA ONLINE UPS MAKE NPS THREE PHASE IN ONE PHASE OUT INSTALLED AT SLDC BHAWAN GOMTI NAGAR LUCKNOW FOR THE PERIOD OF THREE YEARS
2021_UPTCL_547109_1
04/UPSLDC/UPS/2020-21
Open Tender
Electrical Works
Piece-work
1095 days
SLDC BHAWAN GOMTI NAGAR LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Ac No 628105029041 IFSC ICIC0006281 ICICI LKO
₹24,000
22 Feb 2021
19 Jan 2021
5 Feb 2021
19 Jan 2021
4 Feb 2021
19 Jan 2021
Amount
Comprehensive Annual Maintenance Contract of Two Online 10 KVA UPS for the period of Three Years. NPS 10 KVA online UPS with battery each UPS have (60 nos battery, 12 V 120AH, S/N-0320170363, 0320170364) (NPS-Three phase in and one phase out, Technology-Intelligent PWM Ups, Using IGBT module as inverter component, Latest Design-Micro-controller controlled PWM/DSP, Switching Frequency : High Frequency, Input Voltage-140v-300v AC, Single Phase with neutral & earth, Input Frequency-45 to 55 Hz.(Adjustable), Output Voltage-230+/- 1.0%, Single Phase with neutral & earth, Frequency-50 Hz+0.1 % (Crystal Controlled), Rating-10 KVA,Load Power Factor-0.8 lagging,Genset Compatibility-UPS system is fully compatible to genset, Battery Charger-Charger is designed on boost/trickle (CCCV) principle, Certification-ISO 9001,14001,18001 and the product should be 62040-1,62040-2,62040-3 certified , More than 5 hours battery backup on 7000 watts load.) * All the 120 nos. old battaries of both UPS must be replaced with new batteries immediately after starting of Comprehensive Annual Maintenance Contract.
Odyssey Computers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .