Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.1 LAdmitted-Fee/PreQual/Technical/Finance TILAK CHOWK WARORA TEHSIL WARORA DISTRICT CHANDRAPUR MS 442907 | WARORA | CHANDRAPUR | MAHARASHTRA | 442907 | -26.79% | ₹18.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.2 L+₹10,409.53 (0.57%)Admitted-Fee/PreQual/Technical/Finance AT KUCHANA POST KUCHANA TAH BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | MAHARASHTRA | 442503 | -26.37% | ₹18.2 L+₹10,409.53 (0.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹18.3 L+₹14,622.91 (0.81%)Admitted-Fee/PreQual/Technical/Finance AT SAMALEI VIHAR PANCHGACHHIA PO BARAIPAH | -26.20% | ₹18.3 L+₹14,622.91 (0.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹18.6 L+₹44,364.42 (2.45%)Admitted-Fee/PreQual/Technical/Finance EKTA NAGAR 50 NEW MAJRI COLLIERY POST SHIVJINAGAR TEHSIL BHADRAWATI DISTRICT CHANDRAPUR MS 442 503 | CHANDRAPUR | MAHARASHTRA | 442503 | -25.00% | ₹18.6 L+₹44,364.42 (2.45%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹19.9 L+₹1.7 L (9.42%)Admitted-Fee/PreQual/Technical/Finance QUARTER NO B 2 BEHIND FILTER PLANT CAMP NEW MAJRI COLLIERY POST SHIVAJINAGAR TAHSIL BHADRAVATI DISTRICT CHANDRAPUR MS | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442503 | -19.89% | ₹19.9 L+₹1.7 L (9.42%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.2 L
EMD Value
₹36,600
Closing Date
7 Aug 2026, 5:00 pmClosed
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Construction of RC office at Amalgamated Yekona I and II under Yekona Sub Area of Majri Area.
2026_WCL_362460_1
ma9511cive01126-27/209 Dated 23072026
Open Tender
Civil Works - Others
Percentage
120 days
Yekona Sub Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹36,600
8 Aug 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
7 Aug 2026
25 Jul 2026
24 Jul 2026 - 31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK PORTION :- | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal All kinds of soil. | - | Cum | - | - |
| 1.02 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | - | Cum | - | - |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | - | Cum | - | - |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | - | - |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | - | Kg | - | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | - | - |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.89 MB
Tendernotice_2.pdf
PDF • 2.89 MB
BOQ_375364.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .