Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC GURHI MINUS NEAR BUS STAND POST PALACHOURAI TAHSIL JUNNARDEO DISTT CHHINDWARA 480449 MP | CHHINDWARA | MADHYA PRADESH | 480449 | ₹4.8 L Quoted ₹4.1 L | L1 | Accepted-AOC LOWEST
QUOTED
AMOUNT |
| Sl No | Description | Qty | Unit | B AND B GROUP L1 |
|---|---|---|---|---|
| 1.00 | Excavation work in Hard rock-NCWA-10 | 5.4 | cum | 5,000 ₹27,000 |
| 2.00 | Excavation work in Soft rock-NCWA-10 | 4.3 | cum | 4,000 ₹17,200 |
| 3.00 | PCC 1:4:8 (1 CEMENT:4COARSE SAND (ZONE-III) : 8 GRADED STONE AGGREGATE 40MM NOMINAL SIZE) (ITEM CODE 4.1.8 DSR 2018) | 0.9 | cum | 10,000 ₹9,000 |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 360 | kg | 130 ₹46,800 |
| 5.00 | RCC 1:1.5:3 PROVIDING AND LYING IN POSITION SPECIFIED GRADE OF REINFORCED CEMENT CONCRETE, EXCLUDING THE COST OF CENTERING, SHUTTERING, FINISHING AND REINFORCEMENT- ALL WORK UP TO PLINTH LEVEL: 1:1.5:3 (1 CEMENT : 1.5COARSE SAND (ZONE-III): 3GRADED STONE AGGREGATE 20MM NOMINAL SIZE) (ITEM CODE 5.1.2 DSR 2018) | 4.5 | cum | 12,000 ₹54,000 |
| 6.00 | Brick work in superstructure in CM 1:6 | 12.9 | cum | 18,000 ₹2.3 L |
| 7.00 | 12 mm cement plaster 1:6 | 34.4 | sqm | 600 ₹20,640 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹4.4 L
EMD Value
₹5,500
Closing Date
11 Apr 2026, 6:00 pmClosed
STAFF OFFICER MINING PATHAKHERA AREA WCL
OFFICE OF THE STAFF OFFICER MINING GM OFFICE PATHAKHERA AREA WCL
Construction of 3nos. of Retaining wall (fl-ash bricks including all materials) in CM panel W7 of Bagdona seam including all ma-terials at Tawa Mine, Pathakhera Area, WCL.
2026_WCL_357836_1
PK3550-E-MIN-0061-2025-26
Open Tender
Miscellaneous Works
60 days
Tawa Mine, Pathakhera Area, WCL
Please Refer Tender Documents
3 documents required · 3 mandatory
₹5,500
4 Jun 2026
31 Mar 2026
13 Apr 2026
31 Mar 2026
11 Apr 2026
1 Apr 2026
31 Mar 2026 - 4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation work in Hard rock-NCWA-10 | 5.4 | cum | - | - | |
Excavation work in Soft rock-NCWA-10 | 4.3 | cum | - | - | |
PCC 1:4:8 (1 CEMENT:4COARSE SAND (ZONE-III) : 8 GRADED STONE AGGREGATE 40MM NOMINAL SIZE) (ITEM CODE 4.1.8 DSR 2018) | 0.9 | cum | - | - | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 360 | kg | - | - | |
RCC 1:1.5:3 PROVIDING AND LYING IN POSITION SPECIFIED GRADE OF REINFORCED CEMENT CONCRETE, EXCLUDING THE COST OF CENTERING, SHUTTERING, FINISHING AND REINFORCEMENT- ALL WORK UP TO PLINTH LEVEL: 1:1.5:3 (1 CEMENT : 1.5COARSE SAND (ZONE-III): 3GRADED STONE AGGREGATE 20MM NOMINAL SIZE) (ITEM CODE 5.1.2 DSR 2018) | 4.5 | cum | - | - | |
Brick work in superstructure in CM 1:6 | 12.9 | cum | - | - | |
12 mm cement plaster 1:6 | 34.4 | sqm | - | - | |
Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_370699.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid