Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.3 LAccepted-Finance | ₹11.3 L | 1 | Accepted-Finance L1 lowest Bidder |
| 2 | 2₹14.1 L+₹2.8 L (24.9%)Rejected-Finance DURGPAL KAMARDA BALASORE | BALASORE | BALASORE | ODISHA | ₹14.1 L+₹2.8 L (24.9%) | 2 | Rejected-Finance L2 |
| 3 | 2₹14.1 L+₹2.8 L (24.9%)Rejected-Finance | ₹14.1 L+₹2.8 L (24.9%) | 2 | Rejected-Finance L2 |
| 4 | 2₹14.1 L+₹2.8 L (24.9%)Rejected-Finance AT TETELGACHAPADA WARD NO 19 PO PS BHAWANIPATNA DIST KALAHANDI ODISHA | BHAWANIPATNA | KALAHANDI | ODISHA | ₹14.1 L+₹2.8 L (24.9%) | 2 | Rejected-Finance L2 |
| 5 | 2₹14.1 L+₹2.8 L (24.9%)Rejected-Finance AT PO TALBHANRA BELKHANDI KALAHANDI | KALAHANDI | ODISHA | 766001 | ₹14.1 L+₹2.8 L (24.9%) | 2 | Rejected-Finance L2 |
Tender Value
₹14.1 L
EMD Value
₹14,000
Closing Date
20 Jun 2026, 5:00 pmClosed
Block development officer
Panchayat samiti M.Rampur, Kalahandi, 766102
Construction of Additional Class Room at Block Colony School
2026_PRMRB_131160_3
PS-MRMU-T-1/2026-27
Open Tender
Civil Works - Buildings
Percentage
M.Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,000
Yes
12 Sept 2026
8 Jun 2026
22 Jun 2026
8 Jun 2026
20 Jun 2026
8 Jun 2026
8 Jun 2026 - 9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard soil withen 50 met initial lead and 1.5 met lift including dressing and levelling the foundation bed….etc | 46.63 | cum | 276.89 | ₹12,911.38 |
| 2 | Sand filling in foundation and plinth with well watered and and ramming ..etc | 52.8 | cum | 671.51 | ₹35,455.73 |
| 3 | PCC (1:3:6) using 40 mm size CBHG metal in foundation and base including cost conveyance royality ..etc | 13.84 | cum | 5,822.37 | ₹80,581.6 |
| 4 | Brick work with FLY ASH.23x11x8 Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in foundationin and plinth including cost, carriage and royalty etc. | 12.49 | cum | 5,427.12 | ₹67,784.73 |
| 5RCC M20 using 12mm size C.B.H.G chips etc incl cost of all materials & Labours:- | |||||
| 5.1 | Columns Base | 10.02 | Cum | 6,592.2 | ₹66,053.84 |
| 5.2 | Plinth Bend | 3.05 | Cum | 7,462.55 | ₹22,760.78 |
| 5.3 | Column | 3.99 | Cum | 15,855.12 | ₹63,261.93 |
| 5.4 | Lintel | 1.64 | sqm | 14,255.56 | ₹23,379.12 |
| 5.5 | Rcc chajja | 11.64 | sqm | 1,227 | ₹14,282.28 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
Tendernotice_2.pdf
PDF • 1.19 MB
DTCN.pdf
Tender Documents • 1.55 MB
BOQ_594720.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .