Tender Value
₹2.4 Cr
EMD Value
₹4.7 L
Closing Date
17 Jun 2026, 2:00 pm
General Manager, UPPCL, Zone-6 Noida
K-2, Sector-116, Noida Gautambudha Nagar
Development and Construction work of Ramleela ground stage and cultural centre located at Lajpat Nagar of Sahibabad assembly constituency in district Ghaziabad
2026_UPPRC_1157115_1
28/PCL/GM/Zone-6/Noida/2026-27 DT 03.06.2026
Open Tender
Civil Works - Buildings
180 days
Lajpat Nagar of Sahibabad assembly constituency in
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹4.7 L
4 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | - | CUM | 194.21 | - |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | CUM | 5,082.32 | - |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | - | CUM | 1,584.5 | - |
| 4 | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete.(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | - | SQM | 231.33 | - |
| 5 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-20. Upto Plinth Lvl. | - | CUM | 6,748.89 | - |
| 6 | Above Plinth Lvl. | 1 | CUM | 8,584.07 | ₹8,575.49 |
| 7 | As in item no. 6 above but for slabs (Using 1:1.5:3 Mix concrete). Ground Floor | 1 | CUM | 8,584.07 | ₹8,575.49 |
| 8 | M-150 brick work in 1:4 (one cement and four coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | - | CUM | 5,499.12 | - |
| 9 | Applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | - | SQM | 109.04 | - |
| 10 | Same as in item No. 11 above but in super-structure above plinth level up to floor two level ( up to two storeys ) including necessary cutting and moulding of brick work as required and also including honeycombed brick work in thickness of wall more than 12cms. (1:4 cement : coarse sand) Ground Floor | 1 | CUM | 6,971.66 | ₹6,964.69 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tender28.pdf
Tender Documents • 3.32 MB
DWG28.pdf
Additional Documents • 0.92 MB
BOQ_2168216.xls
BOQ • 0.65 MB