Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-AOC | ₹32.4 L Quoted ₹27.5 L | L1 | Accepted-AOC AOC |
| 2 | l2₹27.6 L+₹13,247.19 (0.48%)Rejected-Finance HNO 613 P 41 440 SA SITAPUR ROAD GAURBHEETH FAIZULLAGANJ 2 LUCKNOW LUCKNOW UTTAR PRADESH 226020 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226020 | ₹27.6 L+₹13,247.19 (0.48%) | l2 | Rejected-Finance l2 |
Tender Value
₹32.6 L
EMD Value
₹65,000
Closing Date
11 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
Near Jahanvi Hotel Putlighar Mirzapur
GRAM LUKUTIYA HINATA BLACK PATEHARA ME CHAURAHE SE DEOBALI KE GHAR TAK INTERLOCKING SAKAK KA WORK
2026_REDUP_1145035_46
01/RED/tender/2026-27 Dt 01-04-2026
Open Tender
Civil Works
Percentage
90 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹65,000
Yes
21 Jul 2026
5 May 2026
12 May 2026
5 May 2026
11 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| 2 | E/W in excavation for structures as per drawing and technical specifications Clause 305.1 including dressing of sides and bottom and back filling in trenches with excavated suitable material | 96.82 | cum | 381.9 | ₹36,975.56 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202 & 1203 M-10 | 30.9 | cum | 4,988.45 | ₹1,54,143.1 |
| 4 | Brick masonry work in 1:4 cement mortar in foundation complete excluding pointing & plastering as per drawing and technical specifications Clause 600, 1202 & 1203 | 86.26 | cum | 6,421.05 | ₹5,53,879.77 |
| 5 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202 & 1203 CC-M-20 | 5.92 | cum | 6,784.9 | ₹40,166.61 |
| 6 | Plastering with cement mortar (1:4 ) 15mm thick on brick work in substructure as per technical specification Clause 613.4 & 1204 | 236.9 | sqm | 213.75 | ₹50,637.38 |
| 7 | Construction of granular sub-base by providing well graded Material, Spreeding in Uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 169.44 | cum | 1,304.35 | ₹2,21,009.06 |
| 8 | Providing and laying WBM grade with22.4-53 mm apporved quality SB in 7.50 cm thicknessconsolidating by road roller using stone dust/mooram for blinding materials/screening materialmacking medhi ,including roller including all materrial,labour,T&P | 127.08 | cum | 2,283.8 | ₹2,90,225.3 |
| 9 | Providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of pre cost compressed c.c. passing 30mpa compressive strength ISI marked concrete block pavements per technical specification clause 1504 | 1,694.35 | cum | 764.56 | ₹12,95,432.24 |
| 10 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side | 17.6 | cum | 381.9 | ₹6,721.44 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
tenderdocument.pdf
Tender Documents • 1.02 MB
BOQ_2140743.xls
BOQ • 0.26 MB
corrigendum.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .