Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance BRIGHT COMPLEX 1ST FLOOR NO 173 1ST MAIN ROAD NEHRU NAGAR OMR KOTTIVAKKAM PERUNGUDI CHENNAI 600 096 | CHENNAI | CHENNAI | TAMIL NADU | 600096 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹69.7 L (46.5%)Admitted-Finance | ₹2.2 Cr+₹69.7 L (46.5%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical C3 304B SAUDAMINI COMPLEX RIGHT BHUSARI COLONY PAUD ROAD KOTHRUD PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | - | - | Rejected-Technical Technical not Qualified |
| Sl No | Description | Qty | Unit | Suncon Engineers Private Limited L2 | LandTech AEPC Pvt Ltd., L1 |
|---|---|---|---|---|---|
| 1.00PMC charges for Monitoring and Supervising of Improvement of Sanganoor Pallam works as per Terms & Conditions and Scope of Work as prescribed in the RFP Document for the following works. (Excluding Cost of GST). | |||||
| 1.01 | Package – I
(Chainage From 0m to 2300m) | 49,00,00,000 | Cost | 0.03 ₹1,34,75,000 | 0.02 ₹92,61,000 Lowest |
| 1.02 | Package – II
(Chainage From 2300m to 3300m) | 30,30,00,000 | Cost | 0.03 ₹84,84,000 | 0.02 ₹57,26,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
2 Dec 2021, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Big Bazzar Street, Town Hall, Coimbatore-1
Coimbatore Corporation Request for Proposal for Appointment of Project Management Consultants PMC for Improvement of Sanganoor Pallam from Mettupalayam Road to Sathyamangalam Road at Coimbatore Corporation.
2021_MAWS_213898_1
e-2 /Jnnurm / 2021-22
Open Tender
Civil Works
Works
730 days
Sanganoor Pallam from Mettupalayam Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Yes
The Commissioner, Coimbatore Corporation
₹2 L
27 Dec 2021
20 Nov 2021
3 Dec 2021
20 Nov 2021
2 Dec 2021
20 Nov 2021
Amount
PMC charges for Monitoring and Supervising of Improvement of Sanganoor Pallam works as per Terms & Conditions and Scope of Work as prescribed in the RFP Document for the following works. (Excluding Cost of GST).
Package – I (Chainage From 0m to 2300m)
Package – II (Chainage From 2300m to 3300m)
Suncon Engineers Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .