Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,572Accepted-AOC 2 A DERA SANDHU FARM NARAINA NARAINA 60 KARNAL HARYANA 132116 | KARNAL | KARNAL | HARYANA | 132116 | ₹84,572 | L1 | Accepted-AOC WA |
| 2 | L2₹87,242+₹2,670 (3.16%)Rejected-AOC | ₹87,242+₹2,670 (3.16%) | L2 | Rejected-AOC WNA |
| Sl No | Description | Qty | Unit | Gurvinder Singh L1 | The Godara Coop. L&C Society Ltd. Gobind Garh L2 |
|---|---|---|---|---|---|
| 1.00 | Supply and laying and fixing of 3 Pin plug complete in all respect to the entire satisfaction Engineer-in-Charge. | 40 | Each | 66 ₹2,640 Lowest | 70 ₹2,800 |
| 2.00 | Supply and laying and fixing of Bed switch complete in all respect to the entire satisfaction Engineer-in-Charge. | 21 | Each | 28 ₹588 Lowest | 30 ₹630 |
| 3.00 | Supply and laying and fixing of Capacitor complete in all respect to the entire satisfaction Engineer-in-Charge. | 15 | Each | 33 ₹495 Lowest | 35 ₹525 |
| 4.00 | Supply and laying and fixing of Connection plate complete in all respect to the entire satisfaction Engineer-in-Charge. | 58 | Each | 253 ₹14,674 Lowest | 260 ₹15,080 |
| 5.00 | Supply and laying and fixing of Contractor Patti complete in all respect to the entire satisfaction Engineer-in-Charge. | 8 | Each | 1,595 ₹12,760 Lowest | 1,650 ₹13,200 |
| 6.00 | Supply and laying and fixing of Copper wire 7/16 complete in all respect to the entire satisfaction Engineer-in-Charge. | 18 | Metre | 242 ₹4,356 Lowest | 248 ₹4,464 |
| 7.00 | Supply and laying and fixing of Kit kat 100 Amp. complete in all respect to the entire satisfaction Engineer-in-Charge. | 10 | Each | 770 ₹7,700 Lowest | 795 ₹7,950 |
| 8.00 | Supply and laying and fixing of Kit kat 200 Amp. complete in all respect to the entire satisfaction Engineer-in-Charge. | 13 | Each | 990 ₹12,870 Lowest | 1,025 ₹13,325 |
| 9.00 | Supply and laying and fixing of L/T volt / Amp. Meter complete in all respect to the entire satisfaction Engineer-in-Charge. | 6 | Each | 1,430 ₹8,580 Lowest | 1,470 ₹8,820 |
| 10.00 | Supply and laying and fixing of MCCB 100 Amp. 4 Pole complete in all respect to the entire satisfaction Engineer-in-Charge. | 4 | Each | 3,135 ₹12,540 Lowest | 3,200 ₹12,800 |
Tender Value
₹84,572
EMD Value
₹1,700
Closing Date
1 Jun 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
K-1 A/mtc of EPHS in various Sector UE Karnal
2026_HBC_523914_1
202621F1C3E6 6EE3 487A B17D FC3DD67B83E5240HSV
Open Tender
Civil Works
Works
30 days
Karnal
2 documents required · 2 mandatory
₹250
₹1,700
Yes
21 Sept 2026
25 May 2026
2 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and laying and fixing of 3 Pin plug complete in all respect to the entire satisfaction Engineer-in-Charge. | 40 | Each | 1.25 | ₹50 |
| 2 | Supply and laying and fixing of Bed switch complete in all respect to the entire satisfaction Engineer-in-Charge. | 21 | Each | - | - |
| 3 | Supply and laying and fixing of Capacitor complete in all respect to the entire satisfaction Engineer-in-Charge. | 15 | Each | 100 | ₹1,500 |
| 4 | Supply and laying and fixing of Connection plate complete in all respect to the entire satisfaction Engineer-in-Charge. | 58 | Each | 101 | ₹5,858 |
| 5 | Supply and laying and fixing of Contractor Patti complete in all respect to the entire satisfaction Engineer-in-Charge. | 8 | Each | 102 | ₹816 |
| 6 | Supply and laying and fixing of Copper wire 7/16 complete in all respect to the entire satisfaction Engineer-in-Charge. | 18 | Metre | 103 | ₹1,854 |
| 7 | Supply and laying and fixing of Kit kat 100 Amp. complete in all respect to the entire satisfaction Engineer-in-Charge. | 10 | Each | 104 | ₹1,040 |
| 8 | Supply and laying and fixing of Kit kat 200 Amp. complete in all respect to the entire satisfaction Engineer-in-Charge. | 13 | Each | 105 | ₹1,365 |
| 9 | Supply and laying and fixing of L/T volt / Amp. Meter complete in all respect to the entire satisfaction Engineer-in-Charge. | 6 | Each | 106 | ₹636 |
| 10 | Supply and laying and fixing of MCCB 100 Amp. 4 Pole complete in all respect to the entire satisfaction Engineer-in-Charge. | 4 | Each | 107 | ₹428 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_602860.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .